Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24410
Well Classification: GW Status: PA - 9/13/2024
Well Name/No:CACHE #8-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/13/2024
FacilityID:287758LocationID:306310
County:WELD #123Location:NWSW 8 6N63W 6
Field:WATTENBERG - #90750Elevation:4680 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2059FSL  676 FWLLat/Long: 40.499420 / -104.467890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.499420 / -104.467860Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 9/13/2024             Measured TD: 6970 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 9/13/2024
Wellbore Permit
Permit #:20064907 Expiration Date:11/6/2007
Proposed Depth/Form:7000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SW4

Wellbore Completed
Completion Date:10/10/2007
Spud Date:10/7/2007Spud Date Is:ACTUAL
Measured TD:6970 ft.Measured PB depth:6937 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP DENSITY/ COMP NEUTRON/ GAMMA RAY;CEMENT BOND-VD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 502 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 502 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6951 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 2512 ft., Bottom: 6951 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2800 ft.NN
PARKMAN3548 ft.NN
SUSSEX4297 ft.NN
SHANNON4877 ft.NN
NIOBRARA6524 ft.NN
FORT HAYS6770 ft.NN
CODELL6809 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/6/2008                  Interval Top: 6809 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation CODELL
1st Production Date:1/26/2008Choke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2008
Treatment Summary:FRAC CODL W/3329 BBLS FLUID (DYNAFLOW2) AND 270,000# 20/40 SAND. PUMP 500 BBLS 7% KCL AS SPEARHEAD TREAT AT AN AVERAGE OF 3357# 29.4 BPM. MAX PRESSURE 4632# MAX RATE 31.1 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 54
BTU_GAS 1242
CALC_GOR 1222
CASING_PRESS 300
GRAVITY_OIL 47
MCF_GAS 66
Perforation Data:
Interval Top:6809 ft.# Of Holes:48
Interval Bottom:6821 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/13/2024                 Interval Top: 6618 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/10/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6799 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 52
BTU_GAS 1242
CALC_GOR 365
CASING_PRESS 1000
GRAVITY_OIL 47
MCF_GAS 19
TUBING_PRESS 775
Perforation Data:
Interval Top:6618 ft.# Of Holes:192
Interval Bottom:6821 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/8/2008                  Interval Top: 6618 ft.    Interval Bottom: 6654 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/24/2008
Treatment Summary:FRAC NBRR W/ 4235 BBLS DYNA FLOW2WR & 238000# 30/50 SAND & 12000# RESIN COATED SAND. SPEARHEAD 24 BBLS ACID AHEAD OF FRAC. TREAT @ AND AVERAGE OF 4419# 603. BPM. MAX PRESSURE 5224# MAX RATE 61.7
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 128
BTU_GAS 1242
CALC_GOR 1430
CASING_PRESS 375
GRAVITY_OIL 47
MCF_GAS 183
Perforation Data:
Interval Top:6618 ft.# Of Holes:144
Interval Bottom:6654 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/13/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No