Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24410
Well Classification: GW Status: PA - 9/13/2024
Well Name/No:CACHE #8-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/13/2024
FacilityID:287758LocationID:306310
County:WELD #123Location:NWSW 8 6N63W 6
Field:WATTENBERG - #90750Elevation:4680 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2059FSL  676 FWLLat/Long: 40.499420 / -104.467890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.499420 / -104.467860Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 9/13/2024             Measured TD: 6970 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 9/13/2024
Wellbore Permit
Permit #:20064907 Expiration Date:11/6/2007
Proposed Depth/Form:7000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SW4

Wellbore Completed
Completion Date:10/10/2007
Spud Date:10/7/2007Spud Date Is:ACTUAL
Measured TD:6970 ft.Measured PB depth:6937 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP DENSITY/ COMP NEUTRON/ GAMMA RAY;CEMENT BOND-VD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 502 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 502 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6951 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 2512 ft., Bottom: 6951 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2800 ft.NN
PARKMAN3548 ft.NN
SUSSEX4297 ft.NN
SHANNON4877 ft.NN
NIOBRARA6524 ft.NN
FORT HAYS6770 ft.NN
CODELL6809 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/6/2008                  Interval Top: 6809 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation CODELL
1st Production Date:1/26/2008Choke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2008
Treatment Summary:FRAC CODL W/3329 BBLS FLUID (DYNAFLOW2) AND 270,000# 20/40 SAND. PUMP 500 BBLS 7% KCL AS SPEARHEAD TREAT AT AN AVERAGE OF 3357# 29.4 BPM. MAX PRESSURE 4632# MAX RATE 31.1 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 54
BTU_GAS 1242
CALC_GOR 1222
CASING_PRESS 300
GRAVITY_OIL 47
MCF_GAS 66
Perforation Data:
Interval Top:6809 ft.# Of Holes:48
Interval Bottom:6821 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/13/2024                 Interval Top: 6618 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/10/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6799 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 52
BTU_GAS 1242
CALC_GOR 365
CASING_PRESS 1000
GRAVITY_OIL 47
MCF_GAS 19
TUBING_PRESS 775
Perforation Data:
Interval Top:6618 ft.# Of Holes:192
Interval Bottom:6821 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/8/2008                  Interval Top: 6618 ft.    Interval Bottom: 6654 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/24/2008
Treatment Summary:FRAC NBRR W/ 4235 BBLS DYNA FLOW2WR & 238000# 30/50 SAND & 12000# RESIN COATED SAND. SPEARHEAD 24 BBLS ACID AHEAD OF FRAC. TREAT @ AND AVERAGE OF 4419# 603. BPM. MAX PRESSURE 5224# MAX RATE 61.7
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 128
BTU_GAS 1242
CALC_GOR 1430
CASING_PRESS 375
GRAVITY_OIL 47
MCF_GAS 183
Perforation Data:
Interval Top:6618 ft.# Of Holes:144
Interval Bottom:6654 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/13/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No