|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/25/2024 Measured TD: 7980 ft. Vertical TD: 7928 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/25/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063181 | Expiration Date: | 10/26/2007 | | Proposed Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2593 FSL 1368 FWL | | Bottom Hole Location: | Sec:5 Twp: 2N 67W | Footage: 2593 FSL 1368 FWL | | Proposed Depth/Form: | 7974 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 318A , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 10/21/2007 | | Spud Date: | 10/16/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7980 ft. | Measured PB depth: | 7914 ft. | | True Vertical TD: | 7928 ft. | True Vertical PB depth: | 7862 ft. | | Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2593 FSL 1368 FWL | | Bottom Hole Location: | Sec:5 Twp: 2N 67W | Footage: 2593 FSL 1368 FWL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 684 ft., Weight: J-55 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 684 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7980 ft., Weight: J-55 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6370 ft., Bottom: 7980 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5060 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 4180 ft., Bottom: 5060 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4750 ft. | | N | N | | NIOBRARA | 7100 ft. | | N | N | | CODELL | 7376 ft. | | N | N | | J SAND | 7804 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/25/2024 Interval Top: 7804 ft. Interval Bottom: 7846 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2007 | | Treatment Summary: | JSND COMP: FRAC JSND W/161,834 GAL FRAC FLUID & 250,840# SAND. 11/1/2007 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7804 ft. | # Of Holes: | 68 | | Interval Bottom: | 7846 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/21/2023 Interval Top: 7376 ft. Interval Bottom: 7396 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7376 ft. | # Of Holes: | 80 | | Interval Bottom: | 7396 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 1/26/2012 Interval Top: 7162 ft. Interval Bottom: 7846 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/21/2007 | | Treatment Summary: | JNBCD COMMINGLE; DRILLED OUT CFP @7290'. 11/13/2007. DRILLED OUT CFP @7500' TO COMMINGLE THEJSND-NBRR- CDL 11/14/2007 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7768 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/3/2012 | Test Method: | FLOWING | | Hours Tested: | 6 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 15 | | BTU_GAS | 1294 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 60 | | CALC_GOR | 9667 | | CALC_MCF_GAS | 580 | | CASING_PRESS | 536 | | GRAVITY_OIL | 54 | | MCF_GAS | 145 | | TUBING_PRESS | 341 |
| | Perforation Data: | | Interval Top: | 7162 ft. | # Of Holes: | 188 | | Interval Bottom: | 7846 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OG Status: AB - 1/25/2024 Interval Top: 7162 ft. Interval Bottom: 7396 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2007 | | Treatment Summary: | NBRR - REFRAC – 7162-7182’. FRAC’D W/147,101 GAL FRAC FLUID AND 250,140# SAND.
CDL-REFRAC -7376'-7396'. FRAC'D W/120,422# SAND IN 114,408 GAL FRAC FLUID AND 250,280 # SAND.
SET CIBP @ 7430' AND CFP @ 7220 ON 11/25/11. DRILLED OUT BOT PLUGS ON 12/21/2011. | | Formation Treatment | | Treatment Date: | 11/1/2007 | | Treatment Summary: | NB-CD RECOMPLETION; SET CFP@7500'. FRAC CODL W/113,034 GAL FRAC FLUID & 250,480# 20/40 SAND. 11/1/2007; SEC CFP @7290'. FRAC NBRR W/168,358 GAL FRAC FLUID & 250,740# SAND. 11/1/2007 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7162 ft. | # Of Holes: | 120 | | Interval Bottom: | 7396 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 11/21/2023 Interval Top: 7162 ft. Interval Bottom: 7182 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7162 ft. | # Of Holes: | 40 | | Interval Bottom: | 7182 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|