Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24351
Well Classification: OW Status: PA - 8/8/2019
Well Name/No:REYNOLDS #1-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/8/2019
FacilityID:287496LocationID:336203
County:WELD #123Location:NENE 23 3N68W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:313FNL  1080 FELLat/Long: 40.218030 / -104.964690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.217770 / -104.964660Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/16/2011
End Date: 12/16/2011
Reported: 1/19/2012
Prior to rule 205A.b.(2)(A)
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/10/2019             Measured TD: 7910 ft.    Vertical TD: 7858 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/10/2019
Wellbore PermitDIRECTIONAL
Permit #:20064505 Expiration Date:10/19/2007
Proposed Top PZ Location:Sec:23 Twp: 3N 68W Footage: 778 FNL  648 FEL
Bottom Hole Location:Sec:23 Twp: 3N 68W Footage: 778 FNL  648 FEL
Proposed Depth/Form:8034 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE

Wellbore Completed
Completion Date:3/23/2007
Spud Date:3/16/2007Spud Date Is:ACTUAL
Measured TD:7910 ft.Measured PB depth:7862 ft.
True Vertical TD:7858 ft.True Vertical PB depth:7810 ft.
Top PZ Location:Sec:23 Twp: 3N 68WFootage: 778 FNL  648 FEL
Bottom Hole Location:Sec:23 Twp: 3N 68WFootage: 778 FNL  648 FEL
Log Types:CVL - SP - CDL - MUD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 731 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 731 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7895 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 3424 ft., Bottom: 7895 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3630 ft.NN
SUSSEX4064 ft.NN
SHANNON4654 ft.NN
NIOBRARA7082 ft.NN
FORT HAYS7325 ft.NN
CODELL7344 ft.NN
J SAND7766 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/1/2012                  Interval Top: 7347 ft.    Interval Bottom: 7364 ft.

 Completed Information for Formation CODELL
1st Production Date:5/29/2007Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/2011
Treatment Summary:SET COMPOSITE PLUG @ 7278-7280.
Formation Treatment
Treatment Date:5/10/2007
Treatment Summary:190,361 GALS FLUID & 152,140 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1316
CALC_BBLS_H2O 0
CALC_BBLS_OIL 37
CALC_GOR 1865
CALC_MCF_GAS 69
CASING_PRESS 1400
GRAVITY_OIL 53
TUBING_PRESS 840
Perforation Data:
Interval Top:7347 ft.# Of Holes:68
Interval Bottom:7364 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/8/2019                  Interval Top: 7092 ft.    Interval Bottom: 7364 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/19/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/5/2018Treatment End Date:N/A
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 231,777 gal Slickwater w/ 200,840# 40/70, 4,000# SB Excel and commingled with Codell after composite plug milled out, well circulated to 7854.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7092 ft.# Of Holes:132
Interval Bottom:7364 ft.Hole Size:3.8 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/7/2012                  Interval Top: 7092 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/22/2011Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 231,777 gal Slickwater w/ 200,840# 40/70, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 13
BTU_GAS 1270
CALC_BBLS_OIL 13
CALC_GOR 1462
CALC_MCF_GAS 19
CASING_PRESS 168
GRAVITY_OIL 40
MCF_GAS 19
Perforation Data:
Interval Top:7092 ft.# Of Holes:64
Interval Bottom:7220 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/08/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No