Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24261
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:KIYOTA #6-8-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:286658LocationID:336272
County:WELD #123Location:SWSE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4839 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:627FSL  1996 FELLat/Long: 40.176070 / -104.855480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176083 / -104.855496Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2012
End Date: 1/4/2012
Reported: 8/9/2012
Prior to rule 205A.b.(2)(A)
Days to report: 218
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 8025 ft.    Vertical TD: 7929 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20062985 Expiration Date:9/11/2007
Proposed Top PZ Location:Sec: Twp: Footage: 50 FSL  1280 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67W Footage: 50 FSL  1280 FEL
Proposed Depth/Form:7945 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5225 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 270, Top: 4105 ft., Bottom: 5225 ft.

Wellbore Completed
Completion Date:1/6/2007
Spud Date:12/29/2006Spud Date Is:ACTUAL
Measured TD:8025 ft.Measured PB depth:7928 ft.
True Vertical TD:7929 ft.True Vertical PB depth:7832 ft.
Top PZ Location:Sec:35 Twp: 3N 67WFootage: 72 FSL  1268 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67WFootage: 72 FSL  1268 FEL
Log Types:CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 784 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 784 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8005 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 5490 ft., Bottom: 8005 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4400 ft.NN
NIOBRARA7164 ft.NN
CODELL7436 ft.NN
J SAND7894 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2025                 Interval Top: 7874 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/4/2012
Treatment Summary:CIBP's set @ 7490’ and 7520' on 1/4/2012.
Formation Treatment
Treatment Date:1/6/2007
Treatment Summary:JSND COMPLETION FRAC'D THE J SAND WITH 174,888 GAL FRAC FLUID AND 250,720# SAND. 01/23/07.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7874 ft.# Of Holes:100
Interval Bottom:7924 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/18/2007                 Interval Top: 7436 ft.    Interval Bottom: 7456 ft.

 Completed Information for Formation CODELL
1st Production Date:2/15/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2007
Treatment Summary:CODL RECOMPLETION SET CFP@7520'.01/24/07, FRAC'D THE CODELL WITH 116,360 GAL FRAC FLUID AND 251,060# SAND. 01/25/07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 103
BBLS_OIL 58
BTU_GAS 1212
CALC_BBLS_H2O 103
CALC_BBLS_OIL 58
CALC_GOR 10344
CALC_MCF_GAS 600
CASING_PRESS 1154
MCF_GAS 600
Perforation Data:
Interval Top:7436 ft.# Of Holes:80
Interval Bottom:7456 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 7/16/2007                 Interval Top: 7220 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2007
Treatment Summary:DRILLED OUT CFP'S TO COMMINGLE JSND-NBRR-CDL. 7/10/2007
Tubing Size:2.375 in.Tubing Setting Depth:7865 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 23
BTU_GAS 1212
CALC_BBLS_H2O 18
CALC_BBLS_OIL 23
CALC_GOR 27826
CALC_MCF_GAS 640
CASING_PRESS 1034
MCF_GAS 640
TUBING_PRESS 629
Perforation Data:
Interval Top:7220 ft.# Of Holes:188
Interval Bottom:7924 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 10/1/2025                 Interval Top: 7220 ft.    Interval Bottom: 7456 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/4/2012
Treatment Summary:Niobrara Refrac: Frac’d 7220-7236 with 136,681 gal frac fluid and 250,640 # sand. Codell Refrac: Frac’d 7436-7456 with 126,916 gal frac fluid and 250,320 # sand. Set CIBP's @ 7520' and 7490' on 1/4/12. Set CFP @ 7290' on 1/4/12 and drilled out on 1/27/12.
Tubing Size:2.375 in.Tubing Setting Depth:7424 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2012Test Method:Flowing
Hours Tested:14Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 19
BTU_GAS 1140
CALC_BBLS_H2O 32
CALC_BBLS_OIL 34
CALC_GOR 10764
CALC_MCF_GAS 366
CASING_PRESS 527
GRAVITY_OIL 54
MCF_GAS 206
TUBING_PRESS 398
Perforation Data:
Interval Top:7220 ft.# Of Holes:120
Interval Bottom:7456 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/27/2012                 Interval Top: 7220 ft.    Interval Bottom: 7236 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/22/2007
Treatment Summary:153,732 GALS FRAC FLUID AND 250,120 LBS SAND. PER PHONE CONVERSATION: 8/8/2007
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7220 ft.# Of Holes:32
Interval Bottom:7236 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.019

 Federal Financial Assurance  i 

 Tribal Well  i No