|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/17/2020 Measured TD: 8195 ft. Vertical TD: 7736 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/17/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/7/2012 | Proposed Top PZ Location: | Sec:15 Twp: 3N 65W | Footage: 2566 FSL 2518 FWL | Bottom Hole Location: | Sec:15 Twp: 3N 65W | Footage: 2566 FSL 2518 FWL | Proposed Depth/Form: | 8195 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 814 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 580, Top: 0 ft., Bottom: 814 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8180 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 489, Top: 4200 ft., Bottom: 8180 ft. |
| | |
Wellbore Completed | Completion Date: | 9/10/2007 | Spud Date: | 9/1/2007 | Spud Date Is: | ACTUAL | Measured TD: | 8195 ft. | Measured PB depth: | 8142 ft. | True Vertical TD: | 7736 ft. | True Vertical PB depth: | 7683 ft. | Top PZ Location: | Sec:15 Twp: 3N 65W | Footage: 2566 FSL 2518 FWL | Bottom Hole Location: | Sec:15 Twp: 3N 65W | Footage: 2566 FSL 2518 FWL | Log Types: | CBL, MUD, NO OPEN HOLE LOGS WERE RUN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 580, Top: 0 ft., Bottom: 815 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8180 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 489, Top: 4600 ft., Bottom: 8180 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4540 ft. | | N | N | NIOBRARA | 7241 ft. | | N | N | FORT HAYS | 7500 ft. | | N | N | CODELL | 7524 ft. | | N | N | J SAND | 8020 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/17/2020 Interval Top: 7986 ft. Interval Bottom: 8042 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/20/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/18/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 170,293 gal Slickwater w/ 159,000# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7986 ft. | # Of Holes: | 60 | Interval Bottom: | 8042 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7526 ft. Interval Bottom: 7542 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/20/2007 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/2007 | Treatment Summary: | 168,935 GALS FLUID & 116,705 # 30/50 OTTAWA SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7526 ft. | # Of Holes: | 64 | Interval Bottom: | 7542 ft. | Hole Size: | 0.375 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/25/2011 Interval Top: 7247 ft. Interval Bottom: 8042 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/18/2011 | Treatment Summary: | JSND RECOMPLETE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/25/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 18 | BTU_GAS | 1176 | CALC_BBLS_OIL | 18 | CALC_GOR | 2111 | CALC_MCF_GAS | 38 | CASING_PRESS | 1700 | GRAVITY_OIL | 61 | MCF_GAS | 38 |
| Perforation Data: | Interval Top: | 7247 ft. | # Of Holes: | 204 | Interval Bottom: | 8042 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/17/2020 Interval Top: 7247 ft. Interval Bottom: 7542 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.313 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/10/2007 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7507 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/13/2008 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1274 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 15 | CALC_GOR | 18800 | CALC_MCF_GAS | 282 | CASING_PRESS | 730 | GRAVITY_OIL | 51 | TUBING_PRESS | 320 |
| Perforation Data: | Interval Top: | 7247 ft. | # Of Holes: | 144 | Interval Bottom: | 7542 ft. | Hole Size: | 0.28 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7247 ft. Interval Bottom: 7400 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/20/2007 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/2007 | Treatment Summary: | 70,067 GALS GEL HYBRID FLUID & 249,120 # 30/50 OTTAWA SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7247 ft. | # Of Holes: | 80 | Interval Bottom: | 7400 ft. | Hole Size: | 0.421875 in. |
|
|
|
|
|
Reported Plugged | Y | 09/17/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|