|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/8/2022 Measured TD: 7785 ft. Vertical TD: 7733 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/8/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20063317 | Expiration Date: | 9/6/2007 | Proposed Top PZ Location: | Sec:15 Twp: 4N 65W | Footage: 921 FSL 2597 FEL | Bottom Hole Location: | Sec:15 Twp: 4N 65W | Footage: 921 FSL 2597 FEL | Proposed Depth/Form: | 7705 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5135 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 240, Top: 4115 ft., Bottom: 5135 ft. |
| | |
Wellbore Completed | Completion Date: | 11/28/2006 | Spud Date: | 11/21/2006 | Spud Date Is: | ACTUAL | Measured TD: | 7785 ft. | Measured PB depth: | 7739 ft. | True Vertical TD: | 7733 ft. | True Vertical PB depth: | 7687 ft. | Top PZ Location: | Sec:15 Twp: 4N 65W | Footage: 921 FSL 2597 FEL | Bottom Hole Location: | Sec:15 Twp: 4N 65W | Footage: 921 FSL 2597 FEL | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 579 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 579 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7772 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 6050 ft., Bottom: 7772 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4856 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 210, Top: 3760 ft., Bottom: 4856 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4856 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 210, Top: 3850 ft., Bottom: 4890 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4326 ft. | | N | N | NIOBRARA | 6820 ft. | | N | N | CODELL | 7108 ft. | | N | N | J SAND | 7584 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/8/2022 Interval Top: 7586 ft. Interval Bottom: 7646 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/26/2011 | Treatment Summary: | CIBP set @ 7180’ on 11-26-11 to refrac and test the NBRR-CDL. | Formation Treatment | Treatment Date: | 12/15/2006 | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND W/161,498 GALS FRAC FLUID & 250,040# SAND. 12/10/06 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7586 ft. | # Of Holes: | 80 | Interval Bottom: | 7646 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/16/2012 Interval Top: 7108 ft. Interval Bottom: 7126 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/26/2011 | Treatment Summary: | Frac’d 7108’ – 7126’ w/ 113,168 gal frac fluid and 220,000# sand.
CIBP set @ 7180 11/26/11.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7108 ft. | # Of Holes: | 72 | Interval Bottom: | 7126 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/21/2007 Interval Top: 6820 ft. Interval Bottom: 7646 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/19/2007 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/28/2006 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7000' & 7210' TO COMMINGLE THE JSND-NBRR-CDL. 2/5/07 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7581 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/21/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 60 | BBLS_OIL | 40 | CALC_BBLS_H2O | 60 | CALC_BBLS_OIL | 40 | CALC_GOR | 12775 | CALC_MCF_GAS | 511 | CASING_PRESS | 840 | MCF_GAS | 511 | TUBING_PRESS | 510 |
| Perforation Data: | Interval Top: | 6820 ft. | # Of Holes: | 212 | Interval Bottom: | 7646 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/8/2022 Interval Top: 6820 ft. Interval Bottom: 7126 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/26/2011 | Treatment Summary: | Frac’d 7108’ – 7126
Frac’d 6820’-6836’, 6920’-6934’ | Formation Treatment | Treatment Date: | 12/15/2006 | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7210'. FRAC'D CODELL W/114,114 GAL FRAC FLUID & 250,120# SAND.12/15/06. SET CFP@ 7000'. FRAC'D NBRR W/ 147.250 GAL FRAC FLUID & 250,200# SAND. 12/15/06 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7050 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/8/2012 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 27 | BTU_GAS | 1 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 27 | CALC_MCF_GAS | 304 | CASING_PRESS | 372 | GRAVITY_OIL | 64 | MCF_GAS | 304 |
| Perforation Data: | Interval Top: | 6820 ft. | # Of Holes: | 132 | Interval Bottom: | 7126 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/16/2012 Interval Top: 6820 ft. Interval Bottom: 6934 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/26/2011 | Treatment Summary: | Frac’d 6820’-6836’, 6920’-6934’ w/ 182,404 gal frac fluid and 249,480# sand.
CFP set @ 6990 on 11/26/11 and drilled out 1/3/12.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6820 ft. | # Of Holes: | 60 | Interval Bottom: | 6934 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 11/08/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|