Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24199
Well Classification: GW Status: PA - 3/2/2018
Well Name/No:TRI POINT #E3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/2/2018
FacilityID:286444LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4675 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:244FNL  1241 FELLat/Long: 40.391170 / -104.682280Lat/Long Source: Field Measured
As Drilled Location:306 FNL  1254 FELLat/Long: 40.391019 / -104.682355Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/2/2018             Measured TD: 7893 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/2/2018
Wellbore PermitDIRECTIONAL
Permit #:20064179 Expiration Date:8/28/2007
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 1273   1487 
Bottom Hole Location:Sec:20 Twp: 5N 65W Footage: 1273   1487 
Proposed Depth/Form:8099 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:N/A
Spud Date:3/21/2007Spud Date Is:ACTUAL
Measured TD:7893 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 1273 FNL  1487 FWL
Bottom Hole Location:Sec:20 Twp: 5N 65WFootage: 1273 FNL  1487 FWL
Log Types:CBL, CNL, DIL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 478 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 478 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7878 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 3450 ft., Bottom: 7878 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2527 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 410 ft., Bottom: 2527 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3994 ft.4092 ft.NN
SUSSEX4796 ft.4856 ft.NN
NIOBRARA7357 ft.7678 ft.NN
FORT HAYS7678 ft.7700 ft.NN
CODELL7700 ft.7720 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/16/2007                 Interval Top: 7704 ft.    Interval Bottom: 7714 ft.

 Completed Information for Formation CODELL
1st Production Date:6/23/2007Choke Size:0.156 in.
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2007
Treatment Summary:154,325 GAL FLUID, 271,607# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 75
BTU_GAS 1221
CALC_BBLS_OIL 75
CALC_GOR 1480
CALC_MCF_GAS 111
CASING_PRESS 1350
GRAVITY_OIL 58
MCF_GAS 111
Perforation Data:
Interval Top:7704 ft.# Of Holes:40
Interval Bottom:7714 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/2/2018                  Interval Top: 7372 ft.    Interval Bottom: 7714 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/23/2007Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 75
BTU_GAS 1221
CALC_BBLS_OIL 75
CALC_GOR 1480
CALC_MCF_GAS 111
CASING_PRESS 1350
GRAVITY_OIL 58
MCF_GAS 111
Perforation Data:
Interval Top:7372 ft.# Of Holes:112
Interval Bottom:7714 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/16/2007                 Interval Top: 7372 ft.    Interval Bottom: 7528 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/23/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/6/2007
Treatment Summary:176,682 GAL FLUID, 250,000# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7372 ft.# Of Holes:72
Interval Bottom:7528 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/02/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No