|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/13/2018 Measured TD: 8440 ft. Vertical TD: 7253 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/13/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063225 | Expiration Date: | 8/21/2007 | | Proposed Top PZ Location: | Sec:17 Twp: 5N 65W | Footage: 1914 814 | | Bottom Hole Location: | Sec:17 Twp: 5N 65W | Footage: 1914 814 | | Proposed Depth/Form: | 8671 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 |
| | |
| Wellbore Completed | | Completion Date: | 1/2/2007 | | Spud Date: | 12/23/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8440 ft. | Measured PB depth: | 8378 ft. | | True Vertical TD: | 7253 ft. | True Vertical PB depth: | 7191 ft. | | Top PZ Location: | Sec:17 Twp: 5N 65W | Footage: 1914 FSL 814 FWL | | Bottom Hole Location: | Sec:17 Twp: 5N 65W | Footage: 1914 FSL 814 FWL | | Log Types: | CBL, CNL, CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8423 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 2500 ft., Bottom: 8423 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4596 ft. | 4788 ft. | N | N | | NIOBRARA | 7930 ft. | 8232 ft. | N | N | | FORT HAYS | 8232 ft. | 8254 ft. | N | N | | CODELL | 8254 ft. | 8273 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/27/2014 Interval Top: 8256 ft. Interval Bottom: 8266 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2011 | | Treatment Summary: | Re-Frac CODL w/ 145,404 gal fluid and 301,140# 20/40 sand (32,067 gal SW, 113,337 gal xlink gel)
ISIP=3050, ISDP=3750, ATP=3945, ATR=19.1 | | Formation Treatment | | Treatment Date: | 2/1/2007 | | Treatment Summary: | 108,700 GAL FLUID, 215,889# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 27 | | BTU_GAS | 1258 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 7000 | | CALC_MCF_GAS | 189 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 56 | | MCF_GAS | 189 |
| | Perforation Data: | | Interval Top: | 8256 ft. | # Of Holes: | 40 | | Interval Bottom: | 8266 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/14/2018 Interval Top: 7946 ft. Interval Bottom: 8266 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/15/2011 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/1/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8220 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 25 | | BTU_GAS | 1272 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 4480 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 1790 | | GRAVITY_OIL | 62 | | MCF_GAS | 112 | | TUBING_PRESS | 1350 |
| | Perforation Data: | | Interval Top: | 7946 ft. | # Of Holes: | 88 | | Interval Bottom: | 8266 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/27/2014 Interval Top: 7946 ft. Interval Bottom: 8082 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2011 | | Treatment Summary: | Perf. NBRR A [7,946'-7,952'] & NBRR B [8,076'-8,082'], Re-frac w/ 256,830 gal fluid (158,634 gal SW, 98,196 gal xlink gel) and 293,500# Sand (241,500# 20/40 & 53,800# 40/70)
ISIP=3778, ISDP=3889, ATP=5169, ATR=49.9 | | Formation Treatment | | Treatment Date: | 4/19/2007 | | Treatment Summary: | 180,827 GAL FLUID, 251,180# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7946 ft. | # Of Holes: | 48 | | Interval Bottom: | 8082 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/14/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|