|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/16/2023 Measured TD: 8050 ft. Vertical TD: 7997 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/16/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063188 | Expiration Date: | 8/17/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 50 FSL 1160 FEL | | Bottom Hole Location: | Sec:7 Twp: 3N 65W | Footage: 50 FSL 1160 FEL | | Proposed Depth/Form: | 8020 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: S/2 SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: N/2 NE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5500 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 4200 ft., Bottom: 5500 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/23/2006 | | Spud Date: | 10/12/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 7982 ft. | | True Vertical TD: | 7997 ft. | True Vertical PB depth: | 7929 ft. | | Top PZ Location: | Sec:7 Twp: 3N 65W | Footage: 59 FSL 1168 FEL | | Bottom Hole Location: | Sec:7 Twp: 3N 65W | Footage: 59 FSL 1168 FEL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMKPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 682 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 682 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8023 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 6360 ft., Bottom: 8023 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5494 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 3300 ft., Bottom: 5516 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4528 ft. | | N | N | | NIOBRARA | 7113 ft. | | N | N | | CODELL | 7394 ft. | | N | N | | J SAND | 7838 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/16/2023 Interval Top: 7848 ft. Interval Bottom: 7892 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/2006 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/21/2012 | | Treatment Summary: | CIBP @ 7440 was drilled out. The J Sand is no longer TA; producing with the Niobrara-Codell. | | Formation Treatment | | Treatment Date: | 11/2/2011 | | Treatment Summary: | SET CIBP @ 7440' ON 11/02/11. CBP SET @ 7220' ON 11/10/2011. THE J-SAND IS TA TO TEST THE NBRR. | | Formation Treatment | | Treatment Date: | 11/6/2006 | | Treatment Summary: | JSND COMPLETION. FRAC'D J SAND W/ 159,692 GAL FRAC FLUID & 250,000# SAND. 11/6/06. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7848 ft. | # Of Holes: | 72 | | Interval Bottom: | 7892 ft. | Hole Size: | 4.01 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/16/2023 Interval Top: 7394 ft. Interval Bottom: 7410 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7394 ft. | # Of Holes: | 64 | | Interval Bottom: | 7410 ft. | Hole Size: | 4.02 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/29/2012 Interval Top: 7114 ft. Interval Bottom: 7892 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/21/2012 | | Treatment Summary: | Plugs were drilled out on 2/21/12 and the J Sand, Niobrara and Codell were commingled. | | Formation Treatment | | Treatment Date: | 10/23/2006 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7250'. 3/5/07. DRILLED OUT CFP @ 7480' TO COMMINGLE THE JSND-NBRR-CODL. 3/6/07. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7819 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/26/2012 | Test Method: | Flow | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 11 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 34272 | | CALC_MCF_GAS | 377 | | CASING_PRESS | 667 | | GRAVITY_OIL | 62 | | MCF_GAS | 377 | | TUBING_PRESS | 423 |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 202 | | Interval Bottom: | 7892 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/16/2023 Interval Top: 7114 ft. Interval Bottom: 7410 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/10/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/21/2012 | | Treatment Summary: | Plugs drilled out 2/21/12. | | Formation Treatment | | Treatment Date: | 11/2/2011 | | Treatment Summary: | NIOBRARA - FRAC'D 7114-7134 AND 7169-7182 W/180,091 GAL FRAC FLUID AND 234,895 # SAND. 11/10/11
CODELL - FRAC'D 7394'-7410' W/123,389 GAL FRAC FLUID AND 251,060 # SAND. 11/2/11.
CIBP SET @ 7440 ON 11/02/11. CBP SET @ 7220 ON 11/10/11. | | Formation Treatment | | Treatment Date: | 11/6/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7480'. FRAC'D W/ 129,906 GAL FRAC FLUID & 250,100# SAND. SET CFP @7250'. FRAC'D W/155,700 GAL FRAC FLUID & 250,020# SAND. 11/6/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 12 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 12 | | CALC_MCF_GAS | 409 | | CASING_PRESS | 497 | | GRAVITY_OIL | 61 | | MCF_GAS | 409 |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 130 | | Interval Bottom: | 7410 ft. | Hole Size: | 4.02 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/16/2023 Interval Top: 7114 ft. Interval Bottom: 7182 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 66 | | Interval Bottom: | 7182 ft. | Hole Size: | 4.02 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/16/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|