Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24154
Well Classification: GW Status: SI - 6/1/2025
Well Name/No:DINNER #8-6-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2025
FacilityID:286183LocationID:332615
County:WELD #123Location:SESE 14 4N66W 6
Field:WATTENBERG - #90750Elevation:4721 ft.
Planned Location:482FSL  534 FELLat/Long: 40.306010 / -104.736870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306069 / -104.736682Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2012
End Date: 1/10/2012
Reported: 7/2/2012
Prior to rule 205A.b.(2)(A)
Days to report: 174
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2025             Measured TD: 7925 ft.    Vertical TD: 7819 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20062987 Expiration Date:8/14/2007
Proposed Top PZ Location:Sec:14 Twp: 4N 66W Footage: 1322 FSL  51 FEL
Bottom Hole Location:Sec:14 Twp: 4N 66W Footage: 1322 FSL  51 FEL
Proposed Depth/Form:7930 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5175 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 5175 ft.

Wellbore Completed
Completion Date:2/13/2007
Spud Date:2/6/2007Spud Date Is:ACTUAL
Measured TD:7925 ft.Measured PB depth:7873 ft.
True Vertical TD:7819 ft.True Vertical PB depth:7767 ft.
Top PZ Location:Sec:14 Twp: 4N 66WFootage: 1322 FSL  51 FEL
Bottom Hole Location:Sec:14 Twp: 4N 66WFootage: 1322 FSL  51 FEL
Log Types:CBL.DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 523 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 524 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7903 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 6060 ft., Bottom: 7903 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4986 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 3630 ft., Bottom: 4950 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4410 ft.NN
SHANNON4926 ft.NN
NIOBRARA6991 ft.NN
CODELL7314 ft.NN
J SAND7778 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 6/1/2025                  Interval Top: 7790 ft.    Interval Bottom: 7844 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/25/2007
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND WITH 141,296 GAL FRAC 162,940# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7790 ft.# Of Holes:88
Interval Bottom:7844 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/31/2012                 Interval Top: 7314 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation CODELL
1st Production Date:3/21/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/10/2012
Treatment Summary:Codell Refrac Frac Codell, 7314’ – 7330’ with 117,994 gal frac fluid and 250,470# sand. 01-10-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7314 ft.# Of Holes:64
Interval Bottom:7330 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/23/2007                 Interval Top: 6998 ft.    Interval Bottom: 7844 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/13/2007
Treatment Summary:JSND-NBRR CDL COMMINGLED, DRILLED OUT CFP @ 7220' AND 7430' TO COMMINGLE THE JSND-NBRR-CDL. 3/20/07
Tubing Size:2.375 in.Tubing Setting Depth:7782 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/23/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BBLS_OIL 10
BTU_GAS 1180
CALC_BBLS_H2O 57
CALC_BBLS_OIL 10
CALC_GOR 80400
CALC_MCF_GAS 804
CASING_PRESS 900
MCF_GAS 804
TUBING_PRESS 700
Perforation Data:
Interval Top:6998 ft.# Of Holes:220
Interval Bottom:7844 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 6/1/2025                  Interval Top: 6998 ft.    Interval Bottom: 7844 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/21/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/27/2012
Treatment Summary:CIBP set @ 7390’ on 01-10-12 to refrac the CD and NBRR. Plug was drilled out 02-27-12, tubing set and the J-Niobrara-Codell commingled.
Formation Treatment
Treatment Date:2/25/2007
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7430' 02-25-07 FRAC'D THE CODELL WITH 142,842 GAL FRAC FLUID AND 250,480# 20/40 SAND 02-25-07 SET CFP @ 7220' 02-25-07 FRAC'D THE NIOBRARA WITH 161,784 GAL FRAC FLUID AND 325,688# 20/40 SAND 02-25-07
Tubing Size:2.375 in.Tubing Setting Depth:7774 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 25
BTU_GAS 1
CALC_BBLS_H2O 18
CALC_BBLS_OIL 25
CALC_GOR 9800
CALC_MCF_GAS 245
CASING_PRESS 510
GRAVITY_OIL 63
MCF_GAS 245
TUBING_PRESS 232
Perforation Data:
Interval Top:6998 ft.# Of Holes:220
Interval Bottom:7844 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/31/2012                 Interval Top: 6998 ft.    Interval Bottom: 7122 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/21/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/22/2012
Treatment Summary:Niobrara Refrac Frac Niobrara 6998’ - 7122’ with 133,937 gal frac fluid and 250,130 # sand. 01-22-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6998 ft.# Of Holes:68
Interval Bottom:7122 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)150
Total Gas Produced (MCF)3614
GOR24093
GOR DeterminationMCFE
Average BOE per Day2.142
Average MCFE per Day12.425

 Federal Financial Assurance  i 

 Tribal Well  i No