|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/29/2019 Measured TD: 7570 ft. Vertical TD: 7460 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/29/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063132 | Expiration Date: | 8/14/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1320 FSL 2590 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 1320 FSL 2590 FWL | | Proposed Depth/Form: | 7594 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 11/2/2006 | | Spud Date: | 10/28/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7570 ft. | Measured PB depth: | 7549 ft. | | True Vertical TD: | 7460 ft. | True Vertical PB depth: | 7439 ft. | | Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 1315 FSL 2561 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 1315 FSL 2561 FWL | | Log Types: | CBL, DIL/GL, CDL/CNL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 770 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 770 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7565 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 3424 ft., Bottom: 7565 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3702 ft. | | N | N | | SUSSEX | 4176 ft. | | N | N | | SHANNON | 4708 ft. | | N | N | | NIOBRARA | 7090 ft. | | N | N | | FORT HAYS | 7390 ft. | | N | N | | CODELL | 7411 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/16/2011 Interval Top: 7412 ft. Interval Bottom: 7432 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/8/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2011 | | Treatment Summary: | RETREIVE RBP @ 7332' AND COMMINGLE CODL WITH NBRR PRODUCTION 2/24/2011 | | Formation Treatment | | Treatment Date: | 12/12/2010 | | Treatment Summary: | RBP set at 7340' with sand cap to 7332' | | Formation Treatment | | Treatment Date: | 12/6/2006 | | Treatment Summary: | 163,710 GALS FLUID & 95,626 # 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 45 | | BTU_GAS | 1309 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 2778 | | CALC_MCF_GAS | 125 | | CASING_PRESS | 600 | | GRAVITY_OIL | 52 | | MCF_GAS | 125 |
| | Perforation Data: | | Interval Top: | 7412 ft. | # Of Holes: | 60 | | Interval Bottom: | 7432 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/29/2019 Interval Top: 7184 ft. Interval Bottom: 7432 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/24/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2011 | | Treatment Summary: | NB PERF 7184-7276 HOLES 54 SIZE 0.42 CD PERF 7412-7432 HOLES 60 SIZE 0.38
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7372 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1211 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 900 | | GRAVITY_OIL | 47 | | MCF_GAS | 100 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 114 | | Interval Bottom: | 7432 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 11/16/2011 Interval Top: 7184 ft. Interval Bottom: 7276 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/4/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2010 | | Treatment Summary: | Frac Niobrara w/ 42 gal 15% HCl & 234,276 gal Slickwater w/ 200,820# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 27 | | BTU_GAS | 1202 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 4333 | | CALC_MCF_GAS | 117 | | CASING_PRESS | 157 | | GRAVITY_OIL | 45 | | MCF_GAS | 117 |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 54 | | Interval Bottom: | 7276 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|