|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/10/2023 Measured TD: 7820 ft. Vertical TD: 7699 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/10/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063267 | Expiration Date: | 8/14/2007 | | Proposed Top PZ Location: | Sec:23 Twp: 4N 65W | Footage: 1343 FSL 47 FWL | | Bottom Hole Location: | Sec:23 Twp: 4N 65W | Footage: 1343 FSL 47 FWL | | Proposed Depth/Form: | 7670 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5130 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4090 ft., Bottom: 5130 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/18/2006 | | Spud Date: | 11/7/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7820 ft. | Measured PB depth: | 7772 ft. | | True Vertical TD: | 7699 ft. | True Vertical PB depth: | 7651 ft. | | Top PZ Location: | Sec:23 Twp: 4N 65W | Footage: 1343 FSL 47 FWL | | Bottom Hole Location: | Sec:23 Twp: 4N 65W | Footage: 1343 FSL 47 FWL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 682 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 765, Top: 0 ft., Bottom: 682 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7820 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 6180 ft., Bottom: 7820 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5146 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 3820 ft., Bottom: 5146 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4350 ft. | | N | N | | NIOBRARA | 6944 ft. | | N | N | | CODELL | 7220 ft. | | N | N | | J SAND | 7626 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/10/2023 Interval Top: 7638 ft. Interval Bottom: 7686 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/10/2006 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/30/2006 | | Treatment Summary: | Frac'd dthe J Sand w/ 238/200# 20/40, 12,000# 20/40 Super LC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7638 ft. | # Of Holes: | 68 | | Interval Bottom: | 7686 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/10/2023 Interval Top: 7220 ft. Interval Bottom: 7236 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/10/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7220 ft. | # Of Holes: | 64 | | Interval Bottom: | 7236 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/10/2023 Interval Top: 6944 ft. Interval Bottom: 7686 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/5/2011 | | Treatment Summary: | 3/31/11: DRILLED OUT CBP @ 7160' AND 7300' ON 3/31/11. LANDED 2-3/8" TUBING ON 4/1/11 @ 7623. COMMINGLED ON 4/2/11. | | Formation Treatment | | Treatment Date: | 11/18/2006 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7130' & 7350' TO COMMINGLE THE JSND-NBRR-CDL. 2/19/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7623 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 14 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 24357 | | CALC_MCF_GAS | 341 | | CASING_PRESS | 563 | | GRAVITY_OIL | 61 | | MCF_GAS | 341 | | TUBING_PRESS | 232 |
| | Perforation Data: | | Interval Top: | 6944 ft. | # Of Holes: | 232 | | Interval Bottom: | 7686 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/10/2023 Interval Top: 6944 ft. Interval Bottom: 7236 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/10/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/2/2011 | | Treatment Summary: | NBRR -FRAC'D W/ 138936 BBLS FRAC FLUID AND 250600# SAND
CDL - FRAC'D W/ 121128 BBLS FRAC FLUID AND 250340# SAND
3/31/11: DRILLED OUT CBP @ 7160' AND 7300' | | Formation Treatment | | Treatment Date: | 11/30/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7350'. FRAC'D CODELL W/ 238,520# 20/40 FRAC SAND, 12,000# 20/40 SUPER LC. SET CFP @ 7130'. FRAC'D NBRR W/238,640# 20/40 FRAC SAND, 12,000# 20/40 SUPER LC. 11/30/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6944 ft. | # Of Holes: | 136 | | Interval Bottom: | 7236 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/10/2023 Interval Top: 6944 ft. Interval Bottom: 7052 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/10/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6944 ft. | # Of Holes: | 72 | | Interval Bottom: | 7052 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/10/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|