Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24100
Well Classification: OW Status: PA - 8/17/2022
Well Name/No:FRICO STATE #31-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/17/2022
FacilityID:286005LocationID:332518
County:WELD #123Location:SWNW 15 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Planned Location:2217FNL  511 FWLLat/Long: 40.226500 / -104.657560Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.226530 / -104.657530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/22/2011
End Date: 8/22/2011
Reported: 10/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/17/2022             Measured TD: 7379 ft.    Vertical TD: 7283 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/17/2022
Wellbore PermitDIRECTIONAL
Permit #:20063428 Expiration Date:8/1/2007
Proposed Top PZ Location:Sec:15 Twp: 3N 65W Footage: 1449 FNL  56 FWL
Bottom Hole Location:Sec:15 Twp: 3N 65W Footage: 1449 FNL  56 FWL
Proposed Depth/Form:7355 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:10/2/2006
Spud Date:9/27/2006Spud Date Is:ACTUAL
Measured TD:7379 ft.Measured PB depth:7346 ft.
True Vertical TD:7283 ft.True Vertical PB depth:7250 ft.
Top PZ Location:Sec:15 Twp: 3N 65WFootage: 1449 FNL  56 FWL
Bottom Hole Location:Sec:15 Twp: 3N 65WFootage: 1449 FNL  56 FWL
Log Types:CNL - DIL - CDL - CAL - ML - ML - CBL
Casing:String Type: SURF, Hole Size: 12.75 in., Size: 8.625 in., Top: 12 ft., Depth: 810 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 810 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 12 ft., Depth: 7376 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 3304 ft., Bottom: 7376 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3903 ft.NN
SUSSEX4420 ft.NN
NIOBRARA6968 ft.NN
FORT HAYS7192 ft.NN
CODELL7208 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/20/2022                 Interval Top: 7208 ft.    Interval Bottom: 7222 ft.

 Completed Information for Formation CODELL
1st Production Date:10/26/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/24/2006
Treatment Summary:168,837 GALS FLUID & 115,420 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7208 ft.# Of Holes:56
Interval Bottom:7222 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/17/2022                 Interval Top: 6972 ft.    Interval Bottom: 7222 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/26/2006Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:Re-Frac Codell down 4-1/2" Csg w/ 272,370 gal Slickwater w/ 207,900# 40/70, 4,000# SB Excel, 0# .
Formation Treatment
Treatment Date:10/2/2006
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 20
BTU_GAS 1176
CALC_BBLS_OIL 20
CALC_GOR 1300
CALC_MCF_GAS 26
CASING_PRESS 312
GRAVITY_OIL 59
MCF_GAS 26
TUBING_PRESS 668
Perforation Data:
Interval Top:6972 ft.# Of Holes:166
Interval Bottom:7222 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/20/2022                 Interval Top: 6972 ft.    Interval Bottom: 7130 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/26/2006Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/24/2006
Treatment Summary:168,809 GALS FLUID & 250,100 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6972 ft.# Of Holes:56
Interval Bottom:7130 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/17/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No