|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 8069 ft. Vertical TD: 8001 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | 20062981 | Expiration Date: | 7/25/2006 | Proposed Top PZ Location: | Sec: Twp: | Footage: 115 FNL 1330 FEL | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 115 FNL 1330 FEL | Proposed Depth/Form: | 8100 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 8/8/2006 | Spud Date: | 7/31/2006 | Spud Date Is: | ACTUAL | Measured TD: | 8069 ft. | Measured PB depth: | 8051 ft. | True Vertical TD: | 8001 ft. | True Vertical PB depth: | 7984 ft. | Top PZ Location: | Sec:34 Twp: 3N 66W | Footage: 119 FNL 1347 FEL | Bottom Hole Location: | Sec:34 Twp: 3N 66W | Footage: 119 FNL 1347 FEL | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 838 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8066 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 385, Top: 6320 ft., Bottom: 8066 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4546 ft. | | N | N | NIOBRARA | 7182 ft. | | N | N | CODELL | 7450 ft. | | N | N | J SAND | 7898 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7898 ft. Interval Bottom: 7960 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/11/2006 | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND (7898'-7920', 7934'-7960') WITH 175,363 GAL FRAC FLUID AND 251,820# SAND. 8/11/06 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7898 ft. | # Of Holes: | 96 | Interval Bottom: | 7960 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 11/11/2011 Interval Top: 7230 ft. Interval Bottom: 7960 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/26/2011 | Treatment Summary: | PRODUCTION TUBING: 2 3/8 @ 7452'. CIBP SET AT 7520' AND CFP SET @ 7300' ON 8/7/11; BOTH DRILLED OUT ON 9/20/11. COMMINGLED ON 9/21/2011. | Formation Treatment | Treatment Date: | 8/8/2006 | Treatment Summary: | JSND-NBRR-CODL COMMINGLE DRILLED OUT CIFP @ 7330'. 08-28-06. DRILLED OUT CIFP @ 7550' TO COMMINGLE THE JSND-NBRR-CODL. 12-11-06 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7452 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/26/2011 | Test Method: | FLOW | Hours Tested: | 21 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 18 | BBLS_OIL | 55 | BTU_GAS | 1 | CALC_BBLS_H2O | 21 | CALC_BBLS_OIL | 63 | CALC_GOR | 23760 | CALC_MCF_GAS | 291 | CASING_PRESS | 905 | GRAVITY_OIL | 51 | MCF_GAS | 255 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 7230 ft. | # Of Holes: | 316 | Interval Bottom: | 7960 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2020 Interval Top: 7230 ft. Interval Bottom: 7466 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/7/2011 | Treatment Summary: | NIOBRARA REFRAC 7230'-7250' FRAC'D W/250,100# SAND IN 135,870 GAL FRAC FLUID 08/07/2011. CODELL REFRAC 7450'-7466' FRAC'D W/250,000# SAND IN 133,434 GAL FRAC FLUID 8/7/11. | Formation Treatment | Treatment Date: | 8/11/2006 | Treatment Summary: | SEE SCANNED DOC.#1739813 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 48 | BBLS_OIL | 62 | CALC_BBLS_H2O | 48 | CALC_BBLS_OIL | 62 | CALC_GOR | 9097 | CALC_MCF_GAS | 564 | CASING_PRESS | 1080 | MCF_GAS | 564 |
| Perforation Data: | Interval Top: | 7230 ft. | # Of Holes: | 220 | Interval Bottom: | 7466 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 773 |
Total Gas Produced (MCF) | 16255 |
GOR | 21028 |
GOR Determination | MCFE |
Average BOE per Day | 9.819 |
Average MCFE per Day | 56.945 |
Federal Financial Assurance | i | |
|
|