Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24069
Well Classification: GW Status: PA - 11/1/2024
Well Name/No:FRICO #37-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/1/2024
FacilityID:285844LocationID:332588
County:WELD #123Location:SWSW 15 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:416FSL  1182 FWLLat/Long: 40.219280 / -104.655080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.219300 / -104.655240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/1/2024             Measured TD: 7960 ft.    Vertical TD: 7240 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20073953 Expiration Date:8/21/2008
Proposed Top PZ Location:Sec:15 Twp: 3N 65W Footage: 40 FSL  1357 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65W Footage: 40 FSL  1357 FEL
Proposed Depth/Form:8036 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: ALL

Wellbore Completed
Completion Date:10/4/2007
Spud Date:9/27/2007Spud Date Is:ACTUAL
Measured TD:7960 ft.Measured PB depth:7910 ft.
True Vertical TD:7240 ft.True Vertical PB depth:7190 ft.
Top PZ Location:Sec:15 Twp: 3N 65WFootage: 40 FSL  1357 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65WFootage: 40 FSL  1357 FEL
Log Types:CBL, P/E AILC-CNLD-ML-CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7944 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 3130 ft., Bottom: 7944 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4148 ft.NN
SUSSEX4822 ft.NN
NIOBRARA7530 ft.NN
FORT HAYS7784 ft.NN
CODELL7808 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/7/2008                  Interval Top: 7804 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation CODELL
1st Production Date:10/29/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/12/2007
Treatment Summary:166,002 GAL FLUID & 4000 LBS 20/40 EXCEL SAND 116,660 LBS 30/50 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7804 ft.# Of Holes:60
Interval Bottom:7824 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/1/2024                 Interval Top: 7536 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/29/2007Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7784 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1241
CALC_BBLS_H2O 0
CALC_BBLS_OIL 19
CALC_GOR 15320
CALC_MCF_GAS 291
CASING_PRESS 715
GRAVITY_OIL 52
TUBING_PRESS 470
Perforation Data:
Interval Top:7536 ft.# Of Holes:160
Interval Bottom:7824 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/7/2008                  Interval Top: 7536 ft.    Interval Bottom: 7682 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/29/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/12/2007
Treatment Summary:1000 GAL ACID 245,900 GAL FLUID & 4000 LBS 20/40 SB EXCEL 196,840 LBS 30/50 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7536 ft.# Of Holes:100
Interval Bottom:7682 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/01/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No