Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23976
Well Classification: OW Status: PA - 3/28/2025
Well Name/No:SPRAGUE #11-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/28/2025
FacilityID:285443LocationID:306090
County:WELD #123Location:NWNW 9 2N67W 6
Field:SPINDLE - #77900Elevation:4942 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:661FNL  650 FWLLat/Long: 40.158330 / -104.902190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158332 / -104.902192Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/27/2011
End Date: 3/27/2011
Reported: 2/29/2012
Prior to rule 205A.b.(2)(A)
Days to report: 339
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 3/28/2025             Measured TD: 8075 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 3/28/2025
Wellbore Permit
Permit #:20062763 Expiration Date:6/28/2007
Proposed Depth/Form:8053 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 30, Drill Unit: W2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 4215 ft., Bottom: 5300 ft.

Wellbore Completed
Completion Date:7/30/2006
Spud Date:7/24/2006Spud Date Is:ACTUAL
Measured TD:8075 ft.Measured PB depth:8045 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 0 ft., Bottom: 545 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8060 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 6200 ft., Bottom: 8060 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5190 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 3240 ft., Bottom: 5190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4408 ft.NN
NIOBRARA7192 ft.NN
CODELL7452 ft.NN
J SAND7882 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 3/28/2025                 Interval Top: 7882 ft.    Interval Bottom: 7934 ft.

 Completed Information for Formation J SAND
1st Production Date:8/7/2006Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2006
Treatment Summary:FRAC J SAND (7882'-7888', 7900'-7934') W/158,852 GAL FRAC FLUID AND 250,240# SAND. 8/3/2006
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7882 ft.# Of Holes:80
Interval Bottom:7934 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/12/2024                Interval Top: 7452 ft.    Interval Bottom: 7474 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7452 ft.# Of Holes:88
Interval Bottom:7474 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/11/2011                Interval Top: 7234 ft.    Interval Bottom: 7934 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/30/2011
Treatment Summary:SET CBP @ 7290' 3/27/11. DRILLED OUT ON 4/20/11. CIBP SET @ 7510' 3/27/11. DRILLED OUT ON 4/20/11. TUBING SET AT 7855 ON 4/21/11; COMMINGLED ON 4/272011.
Formation Treatment
Treatment Date:7/30/2006
Treatment Summary:DRILLED OUT CFP@7340 & 7360'. 8/29/06. DRILL OUT CFP @7560'. 8/30/06. SET CBP @7100'. 9/8/06.DRILLED OUT CBP @7100. 9/10/06 TO COMMINGLE THE JNBCD. 9/10/2006
Tubing Size:2.375 in.Tubing Setting Depth:7855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2011Test Method:FLOWING
Hours Tested:2Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 18
BTU_GAS 1
CALC_BBLS_H2O 84
CALC_BBLS_OIL 216
CALC_GOR 3889
CALC_MCF_GAS 840
CASING_PRESS 499
GRAVITY_OIL 49
MCF_GAS 70
TUBING_PRESS 314
Perforation Data:
Interval Top:7234 ft.# Of Holes:312
Interval Bottom:7934 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/28/2025                 Interval Top: 7234 ft.    Interval Bottom: 7474 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/27/2011
Treatment Summary:NBRR - FRAC'D 7234-7258' E/ 143766 GAL FRAC FLUID AND 251020 # SAND. CDL - FRAC'D 7452' - 7474' W/ 120834 GAL FRAC FLUID AND 250840# SAND. SET @ 7290' 3/27/11. DRILLED OUT ON 4/20/11. CIBP SET @ 7510' 3/27/11. DRILLED OUT ON 4/20/2011
Formation Treatment
Treatment Date:8/3/2006
Treatment Summary:SET CFP@7560'.8/3/06 FRAC CODL(7452-7474') W/112,136 GAL FRAC FLD & 250,240# SAND. 8/3/06 SET CFP@ 7360'. 8/3/06. SET CFP@ 7340'. 8/3/06 FRAC NBRR (7234-7258') W/170,542 GAL FRAC FLUID AND 250,380# SAND 8/3/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 18
BTU_GAS 1
CALC_BBLS_H2O 84
CALC_BBLS_OIL 216
CALC_GOR 3889
CALC_MCF_GAS 840
CASING_PRESS 499
GRAVITY_OIL 49
MCF_GAS 70
TUBING_PRESS 314
Perforation Data:
Interval Top:7234 ft.# Of Holes:232
Interval Bottom:7474 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/12/2024                Interval Top: 7234 ft.    Interval Bottom: 7258 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7234 ft.# Of Holes:144
Interval Bottom:7258 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/28/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No