|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/5/2025 Measured TD: 8005 ft. Vertical TD: 7883 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/5/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2010 | | Proposed Top PZ Location: | Sec:1 Twp: 3N 67W | Footage: 1970 FSL 2032 FEL | | Bottom Hole Location: | Sec:1 Twp: 3N 67W | Footage: 1970 FSL 2032 FEL | | Proposed Depth/Form: | 8005 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 768 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 768 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7989 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 605, Top: 3540 ft., Bottom: 7989 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/17/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8005 ft. | Measured PB depth: | 7956 ft. | | True Vertical TD: | 7883 ft. | True Vertical PB depth: | 7834 ft. | | Top PZ Location: | Sec:1 Twp: 3N 67W | Footage: 1970 FSL 2032 FEL | | Bottom Hole Location: | Sec:1 Twp: 3N 67W | Footage: 1965 FSL 2036 FEL | | Log Types: | CDL/CNL- DIL- CBL - MUD | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 768 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7989 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 3540 ft., Bottom: 7989 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1366 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 88 ft., Bottom: 1366 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3840 ft. | | N | N | | SUSSEX | 4397 ft. | | N | N | | SHANNON | 4863 ft. | | N | N | | NIOBRARA | 7085 ft. | | N | N | | FORT HAYS | 7365 ft. | | N | N | | CODELL | 7389 ft. | | N | N | | J SAND | 7837 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/5/2025 Interval Top: 7854 ft. Interval Bottom: 7888 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/2/2010 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2010 | | Treatment Summary: | FRAC JSND W/ 160,944 GAL SW W/ 115,040# 40/70 & 4,000# 20/40 SUPER LC. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7838 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1281 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 20167 | | CALC_MCF_GAS | 242 | | CASING_PRESS | 1153 | | GRAVITY_OIL | 59 | | TUBING_PRESS | 871 |
| | Perforation Data: | | Interval Top: | 7854 ft. | # Of Holes: | 66 | | Interval Bottom: | 7888 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/3/2010 Interval Top: 7390 ft. Interval Bottom: 7406 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/4/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/17/2007 | | Treatment Summary: | 125,293 GALS FLUID & 220,500 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 64 | | Interval Bottom: | 7406 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/5/2025 Interval Top: 7110 ft. Interval Bottom: 7406 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/2/2010 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2006 | | Treatment Summary: | NB PERF 7110-7260, HOLES 98, SIZE 0.43. CD PERF 7390-7406, HOLES 64, SIZE 0.38. NO ADDITIONAL TREATMENT. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7838 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 36 | | BTU_GAS | 1281 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 20167 | | CALC_MCF_GAS | 121 | | CASING_PRESS | 1153 | | GRAVITY_OIL | 59 | | MCF_GAS | 344 | | TUBING_PRESS | 871 |
| | Perforation Data: | | Interval Top: | 7110 ft. | # Of Holes: | 162 | | Interval Bottom: | 7406 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/3/2010 Interval Top: 7110 ft. Interval Bottom: 7260 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/4/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/19/2007 | | Treatment Summary: | 166,223 GALS FLUID & 250,020 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7110 ft. | # Of Holes: | 98 | | Interval Bottom: | 7260 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|