|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/21/2014 Measured TD: 8060 ft. Vertical TD: 7984 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/21/2014 | Wellbore Permit | DIRECTIONAL | Permit #: | 20077224 | Expiration Date: | 2/24/2009 | Proposed Top PZ Location: | Sec: Twp: | Footage: 51 FSL 141 FWL | Bottom Hole Location: | Sec:23 Twp: 3N 66W | Footage: 51 FSL 141 FWL | Proposed Depth/Form: | 8060 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 766 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 530, Top: 0 ft., Bottom: 766 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8050 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 600, Top: 4241 ft., Bottom: 8050 ft. |
| | |
Wellbore Completed | Completion Date: | 6/19/2006 | Spud Date: | 6/13/2006 | Spud Date Is: | ACTUAL | Measured TD: | 8060 ft. | Measured PB depth: | 8036 ft. | True Vertical TD: | 7984 ft. | True Vertical PB depth: | 7960 ft. | Top PZ Location: | Sec: Twp: | Footage: 51 FSL 141 FWL | Bottom Hole Location: | Sec:23 Twp: 3N 66W | Footage: 51 FSL 141 FWL | Log Types: | CBL, CNLD, AILC, CLCV, PEML, ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 766 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 766 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8050 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 4240 ft., Bottom: 8050 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3966 ft. | | N | N | SUSSEX | 4498 ft. | | N | N | TEEPEE BUTTES | 6956 ft. | | N | N | NIOBRARA | 7172 ft. | | N | N | FORT HAYS | 7426 ft. | | N | N | CODELL | 7448 ft. | | N | N | J SAND | 7908 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 5/21/2014 Interval Top: 7908 ft. Interval Bottom: 7950 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/26/2008 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/24/2011 | Treatment Summary: | SAND PLUG SET @ 8036 | Formation Treatment | Treatment Date: | 3/20/2008 | Treatment Summary: | FRAC J SAND W/160,000 GALS SLICKWATER CONTAINING 114,000# 30/50 SAND; 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7908 ft. | # Of Holes: | 72 | Interval Bottom: | 7950 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/21/2014 Interval Top: 7448 ft. Interval Bottom: 7465 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/25/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2011 | Treatment Summary: | REPERF CDL (3/25/2011)
REFrac Codell down 4-1/2" Csg w/ 201,180 gal Slickwater w/ 150,840# 40/70, 4,000# SB Excel, 0# . | Formation Treatment | Treatment Date: | 7/6/2006 | Treatment Summary: | NO ADDITIONAL TREATMENT |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 23 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 23 | CALC_GOR | 8043 | CALC_MCF_GAS | 185 | CASING_PRESS | 980 | GRAVITY_OIL | 51 | MCF_GAS | 185 |
| Perforation Data: | Interval Top: | 7448 ft. | # Of Holes: | 61 | Interval Bottom: | 7465 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/21/2014 Interval Top: 7448 ft. Interval Bottom: 7950 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 3/26/2008 | Choke Size: | 0.156 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/19/2006 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/16/2008 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1266 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 7 | CALC_GOR | 57000 | CALC_MCF_GAS | 399 | CASING_PRESS | 380 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7448 ft. | # Of Holes: | 103 | Interval Bottom: | 7950 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/21/2014 Interval Top: 7187 ft. Interval Bottom: 7465 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/25/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2011 | Treatment Summary: | CDRF-NBRC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/4/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 31 | BTU_GAS | 1191 | CALC_BBLS_OIL | 31 | CALC_GOR | 7323 | CALC_MCF_GAS | 227 | CASING_PRESS | 1320 | GRAVITY_OIL | 56 | MCF_GAS | 227 | TUBING_PRESS | 939 |
| Perforation Data: | Interval Top: | 7187 ft. | # Of Holes: | 127 | Interval Bottom: | 7465 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 5/21/2014 Interval Top: 7187 ft. Interval Bottom: 7312 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/25/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/1/2011 | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 247,296 gal Slickwater w/ 200,780# 40/70, 4,000# SB Excel, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7187 ft. | # Of Holes: | 66 | Interval Bottom: | 7312 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/21/2014 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|