|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/3/2024 Measured TD: 7177 ft. Vertical TD: 7077 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/3/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20061253 | Expiration Date: | 5/24/2007 | | Proposed Top PZ Location: | Sec:33 Twp: 4N 64W | Footage: 1315 FNL 2608 FWL | | Bottom Hole Location: | Sec:33 Twp: 4N 64W | Footage: 1315 FNL 2608 FWL | | Proposed Depth/Form: | 7250 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,318 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407,318 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/16/2006 | | Spud Date: | 8/12/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7177 ft. | Measured PB depth: | 7155 ft. | | True Vertical TD: | 7077 ft. | True Vertical PB depth: | 7055 ft. | | Top PZ Location: | Sec:33 Twp: 4N 64W | Footage: 1315 FNL 2608 FWL | | Bottom Hole Location: | Sec:33 Twp: 4N 64W | Footage: 1315 FNL 2608 FWL | | Log Types: | GR/CCL/CBL, DIL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 549 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 549 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7156 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 3333 ft., Bottom: 7156 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3770 ft. | | N | N | | SUSSEX | 4298 ft. | | N | N | | SHANNON | 5035 ft. | | N | N | | NIOBRARA | 6745 ft. | | N | N | | FORT HAYS | 6989 ft. | | N | N | | CODELL | 7011 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/11/2022 Interval Top: 7013 ft. Interval Bottom: 7025 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/14/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/12/2006 | | Treatment Summary: | FRAC'D CODL W/128,058 GALS OF SILVERSTIM WITH 32# GEL LOADINGS AND 271,440#'S OF 20/40 OTTAWA SAND. CODL PRODUCING THROUGH FRAC PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7013 ft. | # Of Holes: | 48 | | Interval Bottom: | 7025 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/3/2024 Interval Top: 6752 ft. Interval Bottom: 7025 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/14/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/19/2009 | | Treatment Summary: | CODL PERFS 7013-7025./ RE-FRAC CODL W/ 130,326 GALS VISTAR W/ 245,098# OTTAWA SAND. COMMINGLE NBRR & CODL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 7 | | BTU_GAS | 1310 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 14857 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 740 | | GRAVITY_OIL | 60 | | MCF_GAS | 104 | | TUBING_PRESS | 190 |
| | Perforation Data: | | Interval Top: | 6752 ft. | # Of Holes: | 216 | | Interval Bottom: | 7025 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/11/2022 Interval Top: 6752 ft. Interval Bottom: 6823 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/14/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/19/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6752 ft. | # Of Holes: | 168 | | Interval Bottom: | 6823 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/03/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|