|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/20/2022 Measured TD: 8060 ft. Vertical TD: 7981 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/20/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20077232 | Expiration Date: | 3/5/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2533 FSL 2680 FEL | | Bottom Hole Location: | Sec:1 Twp: 3N 66W | Footage: 2539 FSL 2686 FEL | | Proposed Depth/Form: | 8060 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: ALL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 632 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 632 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8057 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 625, Top: 3750 ft., Bottom: 8057 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/20/2006 | | Spud Date: | 6/13/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8060 ft. | Measured PB depth: | 8043 ft. | | True Vertical TD: | 7981 ft. | True Vertical PB depth: | 7964 ft. | | Top PZ Location: | Sec: Twp: | Footage: 2533 FSL 2680 FEL | | Bottom Hole Location: | Sec:1 Twp: 3N 66W | Footage: 2533 FSL 2680 FEL | | Log Types: | CBL,CNLD,PEML,AILC,MUD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 632 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 632 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8057 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 3750 ft., Bottom: 8057 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3909 ft. | | N | N | | SUSSEX | 4338 ft. | | N | N | | NIOBRARA | 7136 ft. | | N | N | | FORT HAYS | 7396 ft. | | N | N | | CODELL | 7418 ft. | | N | N | | J SAND | 7881 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/21/2022 Interval Top: 7900 ft. Interval Bottom: 7946 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/8/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/2008 | | Treatment Summary: | PERF JSND > 7900-7914 (2SPF) 7926-7946 (2SPF); FRAC JSND W/160,322 GALS FLUID & 56,000# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 68 | | Interval Bottom: | 7946 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 9/1/2006 Interval Top: 7420 ft. Interval Bottom: 7436 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/24/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/10/2006 | | Treatment Summary: | 167,160 GALS FLUID & 115,100 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7420 ft. | # Of Holes: | 64 | | Interval Bottom: | 7436 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/7/2008 Interval Top: 7140 ft. Interval Bottom: 7946 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/8/2008 | Choke Size: | 0.219 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2006 | | Treatment Summary: | NIOBRARA PERFS 07/10/2006 > 7140 - 7152 (3SPF) 7204-7218 (3SPF) 7286-7306 (1SPF); CODELL PERFS 07/07/2008 > 7420 - 7436 (4SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1202 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 61667 | | CALC_MCF_GAS | 370 | | CASING_PRESS | 660 | | GRAVITY_OIL | 59 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7140 ft. | # Of Holes: | 230 | | Interval Bottom: | 7946 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/21/2022 Interval Top: 7140 ft. Interval Bottom: 7436 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/24/2006 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/20/2006 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 16964 | | CALC_MCF_GAS | 475 | | CASING_PRESS | 2597 | | GRAVITY_OIL | 50 | | MCF_GAS | 475 |
| | Perforation Data: | | Interval Top: | 7140 ft. | # Of Holes: | 162 | | Interval Bottom: | 7436 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/1/2006 Interval Top: 7140 ft. Interval Bottom: 7306 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/24/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/10/2006 | | Treatment Summary: | 172,033 GALS FLUID & 251,740 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7140 ft. | # Of Holes: | 98 | | Interval Bottom: | 7306 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/21/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|