|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/2/2020 Measured TD: 8058 ft. Vertical TD: 7988 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/2/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20085613 | Expiration Date: | 9/22/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2538 FNL 33 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 2538 FNL 33 FWL | | Proposed Depth/Form: | 8058 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S22SW | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 756 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 756 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8049 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 680, Top: 3454 ft., Bottom: 8049 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/15/2006 | | Spud Date: | 7/6/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8058 ft. | Measured PB depth: | 8017 ft. | | True Vertical TD: | 7988 ft. | True Vertical PB depth: | 7947 ft. | | Top PZ Location: | Sec: Twp: | Footage: 2538 FNL 33 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 66W | Footage: 2538 FNL 33 FWL | | Log Types: | CBL, MUD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 756 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 756 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8049 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 3454 ft., Bottom: 8049 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4374 ft. | | N | N | | NIOBRARA | 7166 ft. | | N | N | | FORT HAYS | 7379 ft. | | N | N | | CODELL | 7401 ft. | | N | N | | CARLILE | 7419 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 9/2/2020 Interval Top: 7900 ft. Interval Bottom: 7940 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2011 | | Treatment Summary: | SAND PLUG SET @ 7965 | | Formation Treatment | | Treatment Date: | 10/22/2008 | | Treatment Summary: | PERFORATION INTERVALS: 7900-7910', 7920-7940'. 151,242 GAL FLUID; 116,550# 40/40 SAND & 4,020# 20/40 RESIN COAT SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 60 | | Interval Bottom: | 7940 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 7/21/2011 Interval Top: 7448 ft. Interval Bottom: 7464 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/17/2006 | | Treatment Summary: | NO ADDITIONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 64 | | Interval Bottom: | 7464 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/26/2008 Interval Top: 7166 ft. Interval Bottom: 7940 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/10/2008 | Choke Size: | 0.156 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/15/2006 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7891 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/26/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1272 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 267000 | | CALC_MCF_GAS | 534 | | CASING_PRESS | 1236 | | GRAVITY_OIL | 42 | | TUBING_PRESS | 1069 |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 228 | | Interval Bottom: | 7940 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/2/2020 Interval Top: 7166 ft. Interval Bottom: 7464 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/21/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/6/2011 | | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 262,945 gal Slickwater w/ 208,320# 40/70, 4,000# SB Excel. | | Formation Treatment | | Treatment Date: | 7/15/2006 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 22 | | BTU_GAS | 1219 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 10272 | | CALC_MCF_GAS | 226 | | CASING_PRESS | 2300 | | GRAVITY_OIL | 57 | | MCF_GAS | 226 |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 168 | | Interval Bottom: | 7464 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/21/2011 Interval Top: 7166 ft. Interval Bottom: 7320 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/17/2006 | | Treatment Summary: | NO ADDITIONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 104 | | Interval Bottom: | 7320 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/02/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|