Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23825
Well Classification: GW Status: PA - 7/26/2024
Well Name/No:DEHAAN V #27-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/26/2024
FacilityID:284510LocationID:336206
County:WELD #123Location:SWSE 27 2N67W 6
Field:WATTENBERG - #90750Elevation:4983 ft.
Planned Location:610FSL  1772 FELLat/Long: 40.103710 / -104.874010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103704 / -104.874057Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/26/2024             Measured TD: 7767 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/26/2024
Wellbore Permit
Permit #:20060964 Expiration Date:4/26/2007
Proposed Depth/Form:7800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE4

Wellbore Completed
Completion Date:7/5/2006
Spud Date:7/1/2006Spud Date Is:ACTUAL
Measured TD:7767 ft.Measured PB depth:7709 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 655, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7753 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 3821 ft., Bottom: 7753 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4120 ft.NN
SUSSEX4500 ft.NN
SHANNON5080 ft.NN
NIOBRARA7317 ft.NN
FORT HAYS7587 ft.NN
CODELL7608 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/3/2006                 Interval Top: 7610 ft.    Interval Bottom: 7625 ft.

 Completed Information for Formation CODELL
1st Production Date:9/18/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2006
Treatment Summary:FRAC'D CODELL W/ 128,898 GALS OF SILVERSTIM W/ 32# GEL LOADING AND 274,420# OF 30/50 OTTAWA SAND. CODELL PRODUCING THROUGH FLOW PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7610 ft.# Of Holes:72
Interval Bottom:7625 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/26/2024                 Interval Top: 7390 ft.    Interval Bottom: 7625 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/18/2006Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2006
Treatment Summary:COMMINGLE CODELL & NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/3/2006Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
CASING_PRESS 1100
MCF_GAS 64
Perforation Data:
Interval Top:7390 ft.# Of Holes:180
Interval Bottom:7625 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/3/2006                 Interval Top: 7390 ft.    Interval Bottom: 7408 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/18/2006Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2006
Treatment Summary:FRAC'D NBRR W/ 70,056 GALS OF SLICKWATER, 100,128 GALS OF SILVERSTIM W/28# GEL LOADING & 250,140# OF PROPPANT, 238,140# OF 30/50 SAND & 12,000# 12/20 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7390 ft.# Of Holes:108
Interval Bottom:7408 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/26/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No