Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23822
Well Classification: GW Status: SI - 10/1/2023
Well Name/No:MARTINSON #24-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2023
FacilityID:284513LocationID:306009
County:WELD #123Location:SESW 24 4N66W 6
Field:WATTENBERG - #90750Elevation:4747 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:662FSL  2034 FWLLat/Long: 40.292230 / -104.727640Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.292220 / -104.727650Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2023             Measured TD: 7830 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2023
Wellbore Permit
Permit #:20061101 Expiration Date:4/26/2007
Proposed Depth/Form:7824 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4000 ft., Bottom: 5000 ft.

Wellbore Completed
Completion Date:1/15/2007
Spud Date:1/9/2007Spud Date Is:ACTUAL
Measured TD:7830 ft.Measured PB depth:7796 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7820 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 6170 ft., Bottom: 7820 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7820 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 3530 ft., Bottom: 5008 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4315 ft.NN
SHANNON4825 ft.NN
NIOBRARA6915 ft.NN
CODELL7212 ft.NN
J SAND7696 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2023                 Interval Top: 7696 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2007
Treatment Summary:JSND COMPLETION FRAC'D THE J SAND WITH 155,800 GAL FRAC FLUID AND 238,360# 30/50 SAND, 12,000# 12/20 SB EXCEL RCS.03/08-07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7696 ft.# Of Holes:80
Interval Bottom:7750 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/14/2007                 Interval Top: 6916 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2007
Treatment Summary:JNBCD COMMINGLE DRILLED UP CFP @ 7100 AND 7340' TO COMMINGLE THE JSND-NBRR-CODL 03/30/07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/14/2007Test Method:FLOWONG
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 160
BBLS_OIL 108
BTU_GAS 1162
CALC_BBLS_H2O 160
CALC_BBLS_OIL 108
CALC_GOR 7315
CALC_MCF_GAS 790
CASING_PRESS 1300
GRAVITY_OIL 61
MCF_GAS 790
Perforation Data:
Interval Top:6916 ft.# Of Holes:212
Interval Bottom:7750 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 10/1/2023                 Interval Top: 6916 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2007
Treatment Summary:NB-CD RECOMPLETION SET CFP@7340'. 3/08/07. FRAC'D THE CODL W/113,100 GAL FRAC FLUID AND 251,120# 30/50 SAND. 3/08/07 SET CFP@7100'. 3/08/07. FRAC'D THE NBRR W/167,370 GAL FRAC FLUID AND 250,280# 30/50 SAND. 3/08/07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6916 ft.# Of Holes:132
Interval Bottom:7228 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY01/14/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
09/09/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
01/29/2025
Defined Inactive (SI )YDefined Inactive
09/30/2023
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No