|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/27/2017 Measured TD: 8130 ft. Vertical TD: 8011 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/27/2017 | Wellbore Permit | DRIFTED | Permit #: | 20070900 | Expiration Date: | 3/26/2008 | Prop Depth/Form: | 8011 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 718 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 510, Top: 0 ft., Bottom: 718 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8108 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 225, Top: 6754 ft., Bottom: 8108 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4882 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 175, Top: 3950 ft., Bottom: 4882 ft. |
| | |
Wellbore Completed | Completion Date: | 6/7/2006 | Spud Date: | 5/31/2006 | Spud Date Is: | ACTUAL | Measured TD: | 8130 ft. | Measured PB depth: | 8094 ft. | True Vertical TD: | 8011 ft. | True Vertical PB depth: | 7975 ft. | Top PZ Location: | Sec: Twp: | Footage: 663 FSL 677 FEL | Depth | Bottom Hole Location: | Sec:13 Twp: 2N 67W | Footage: 663 FSL 677 FEL | Depth | Log Types: | PEML, ML, PECL, AILC, CNLD, CBL MUD # 1837167 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 510, Top: 0 ft., Bottom: 718 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 8108 ft., Depth: 8108 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 6750 ft., Bottom: 8108 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4882 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 3950 ft., Bottom: 4882 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4883 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 3910 ft., Bottom: 4980 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4008 ft. | | N | N | SUSSEX | 4375 ft. | | N | N | NIOBRARA | 7222 ft. | | N | N | FORT HAYS | 7477 ft. | | N | N | CODELL | 7498 ft. | | N | N | J SAND | 7940 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/10/2018 Interval Top: 7958 ft. Interval Bottom: 7990 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/8/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 4/18/2007 | Treatment Summary: | PERF & FRAC JSND W/14949 GLAS FLUID & 90,100# 20/40 SAND. 7958-7990 (2 SPF). |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7958 ft. | # Of Holes: | 64 | Interval Bottom: | 7990 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 1/10/2018 Interval Top: 7500 ft. Interval Bottom: 7520 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/27/2006 | Treatment Summary: | 144,738 GALS FLUID & 115,580 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 1 | CALC_BBLS_OIL | 1 | CALC_GOR | 80000 | CALC_MCF_GAS | 80 | CASING_PRESS | 1613 | GRAVITY_OIL | 49 | MCF_GAS | 80 | TUBING_PRESS | 1097 |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 60 | Interval Bottom: | 7520 ft. | Hole Size: | 0.45 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/26/2007 Interval Top: 7500 ft. Interval Bottom: 7990 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 5/8/2007 | Choke Size: | 0.281 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2006 | Treatment Summary: | CODL PERFS 06/23/2006, 7500-7520. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7910 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/26/2007 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1422 | CALC_BBLS_OIL | 11 | CALC_GOR | 3364 | CALC_MCF_GAS | 37 | CASING_PRESS | 600 | GRAVITY_OIL | 50 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 124 | Interval Bottom: | 7990 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|