Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23796
Well Classification: GW Status: TA - 3/28/2023
Well Name/No:LINDSAY C #33-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/28/2023
FacilityID:284381LocationID:305994
County:WELD #123Location:SWNE 33 4N64W 6
Field:WATTENBERG - #90750Elevation:4730 ft.
Planned Location:1320FNL  1472 FELLat/Long: 40.272610 / -104.551790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.272597 / -104.551814Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 3/28/2023             Measured TD: 7079 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 3/28/2023
Wellbore Permit
Permit #:20060966 Expiration Date:4/19/2007
Proposed Depth/Form:7050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE

Wellbore Completed
Completion Date:5/17/2006
Spud Date:5/13/2006Spud Date Is:ACTUAL
Measured TD:7079 ft.Measured PB depth:7050 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 517 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 517 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7066 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 3206 ft., Bottom: 7066 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3630 ft.NN
SUSSEX4237 ft.NN
NIOBRARA6630 ft.NN
FORT HAYS6871 ft.NN
CODELL6894 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/28/2023                 Interval Top: 6896 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation CODELL
1st Production Date:6/23/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2006
Treatment Summary:FRAC CODL W/129,948 GAL SILVERSTIM W/28# GEL LOADINGS AND 270,740# OF 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6896 ft.# Of Holes:52
Interval Bottom:6909 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 3/28/2023                 Interval Top: 6624 ft.    Interval Bottom: 6909 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/23/2006Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/2009
Treatment Summary:CODL PERFS FROM 6896-6909, RE-FRAC'D CODL W/ 129,906 GALS VISTAR W/ 244,375# OTTAWA SAND. COMMINGLE CODL & NBRR.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 17
BTU_GAS 1271
CALC_BBLS_H2O 8
CALC_BBLS_OIL 17
CALC_GOR 12941
CALC_MCF_GAS 220
CASING_PRESS 680
GRAVITY_OIL 57
MCF_GAS 220
TUBING_PRESS 420
Perforation Data:
Interval Top:6624 ft.# Of Holes:244
Interval Bottom:6909 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/28/2023                 Interval Top: 6624 ft.    Interval Bottom: 6704 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/23/2006Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6624 ft.# Of Holes:192
Interval Bottom:6704 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
02/28/2017
Low ProducingYProduction Period
02/2024 - 01/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No