Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23770
Well Classification: GW Status: PR - 6/1/2023
Well Name/No:MARTINSON #13-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2023
FacilityID:284194LocationID:332684
County:WELD #123Location:NWSW 24 4N66W 6
Field:WATTENBERG - #90750Elevation:4736 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1955FSL  678 FWLLat/Long: 40.295630 / -104.732500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.295630 / -104.732502Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2023             Measured TD: 7911 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2023
Wellbore Permit
Permit #:20060887 Expiration Date:4/10/2007
Proposed Top PZ Location:Sec:24 Twp: 4N 66W Footage: 1915 FSL  989 FWL
Bottom Hole Location:Sec:24 Twp: 4N 66W Footage: 1915 FSL  989 FWL
Proposed Depth/Form:7834 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4000 ft., Bottom: 5000 ft.

Wellbore Completed
Completion Date:3/15/2007
Spud Date:2/28/2007Spud Date Is:ACTUAL
Measured TD:7911 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:24 Twp: 4N 66WFootage: 1915 FSL  989 FWL
Bottom Hole Location:Sec:24 Twp: 4N 66WFootage: 1915 FSL  989 FWL
Log Types:CBL, DUAL IN/COMPENSATED DENSITY.COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 532 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 532 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 7898 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 6090 ft., Bottom: 7898 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4886 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 165, Top: 3100 ft., Bottom: 4886 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4450 ft.NN
SHANNON4790 ft.NN
NIOBRARA6920 ft.NN
CODELL7222 ft.NN
J SAND7690 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 6/1/2023                  Interval Top: 7750 ft.    Interval Bottom: 7802 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/19/2007
Treatment Summary:JSND COMPLETION FRAC'D THE JSAND W/ 12,000# 12/20 SB EXCEL, 250,560# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7750 ft.# Of Holes:40
Interval Bottom:7802 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/24/2007                 Interval Top: 6918 ft.    Interval Bottom: 7802 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/19/2007
Treatment Summary:J-NB-CD PRODUCTION TUBING INF.
Tubing Size:2.375 in.Tubing Setting Depth:7730 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/2007Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 87
BBLS_OIL 55
BTU_GAS 1162
CALC_GOR 18000
CASING_PRESS 4230
GRAVITY_OIL 61
MCF_GAS 990
Perforation Data:
Interval Top:6918 ft.# Of Holes:172
Interval Bottom:7802 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 6/1/2023                  Interval Top: 6918 ft.    Interval Bottom: 7256 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/19/2007
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7350 03/19/07 FRAC'D THE CODELL W/ 250,140# 30/50 SAND 03/19/07 SET CFP @ 7130' 03/19/07 FRAC'D THE NIOBRARA W/ 250,440# 30/50 SAND, 170,080 GAL FRAC FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6918 ft.# Of Holes:132
Interval Bottom:7256 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)443
Total Gas Produced (MCF)21025
GOR47460
GOR DeterminationMCFE
Average BOE per Day11.120
Average MCFE per Day64.509

 Federal Financial Assurance  i 

 Tribal Well  i No