|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 3/3/2016 Measured TD: 7660 ft. Vertical TD: 7578 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 3/3/2016 | Wellbore Permit | DIRECTIONAL | Permit #: | 20060360 | Expiration Date: | 3/7/2007 | Proposed Top PZ Location: | Sec:23 Twp: 3N 66W | Footage: 1293 FNL 45 FEL | Bottom Hole Location: | Sec:23 Twp: 3N 66W | Footage: 1293 FNL 45 FEL | Proposed Depth/Form: | 7628 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
Wellbore Completed | Completion Date: | 4/28/2006 | Spud Date: | 4/23/2006 | Spud Date Is: | ACTUAL | Measured TD: | 7660 ft. | Measured PB depth: | 7623 ft. | True Vertical TD: | 7578 ft. | True Vertical PB depth: | 7541 ft. | Top PZ Location: | Sec:23 Twp: 3N 66W | Footage: 1293 FNL 45 FEL | Bottom Hole Location: | Sec:23 Twp: 3N 66W | Footage: 1293 N 45 E | Log Types: | CBL, CNLD,AILC,PEML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 705 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 485, Top: 0 ft., Bottom: 705 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7655 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 3630 ft., Bottom: 7655 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4055 ft. | | N | N | SUSSEX | 4483 ft. | | N | N | NIOBRARA | 7217 ft. | | N | N | FORT HAYS | 7472 ft. | | N | N | CODELL | 7494 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/24/2011 Interval Top: 7494 ft. Interval Bottom: 7512 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/22/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/13/2008 | Treatment Summary: | Drilled out CIBP and commingled with NBRR production. | Formation Treatment | Treatment Date: | 5/15/2006 | Treatment Summary: | BRIDGE PLUG PLACED @ 7400'. 2 SX CEMENT WERE PLACED ON BRIDGE PLUG FOR MECH. INTEGRITY. OUR INTENT IS TO REMOVE CEMENT & BRIDGE PLUG & COMMINGLE W/THE NBRR W/IN 6 MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 15 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 15 | CALC_GOR | 15600 | CALC_MCF_GAS | 234 | CASING_PRESS | 507 | GRAVITY_OIL | 58 | MCF_GAS | 234 |
| Perforation Data: | Interval Top: | 7494 ft. | # Of Holes: | 54 | Interval Bottom: | 7512 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 3/3/2016 Interval Top: 7225 ft. Interval Bottom: 7512 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/28/2011 | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 254,352 gal Slickwater w/ 207,780# 40/70, 4,040# SB Excel. | Formation Treatment | Treatment Date: | 5/13/2008 | Treatment Summary: | Drilled out CIBP to commingle NB/CD production. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 9 | BTU_GAS | 1287 | CALC_BBLS_OIL | 9 | CALC_GOR | 16000 | CALC_MCF_GAS | 144 | CASING_PRESS | 2100 | GRAVITY_OIL | 60 | MCF_GAS | 144 | TUBING_PRESS | 710 |
| Perforation Data: | Interval Top: | 7225 ft. | # Of Holes: | 174 | Interval Bottom: | 7512 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/24/2011 Interval Top: 7225 ft. Interval Bottom: 7365 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/17/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/13/2008 | Treatment Summary: | Drilled out CIBP to commingle with CODL production. | Formation Treatment | Treatment Date: | 3/12/2008 | Treatment Summary: | PERF NBRR 'C' FRM 7345-7365', NBRR 'B' FRM 7270-7280', & NBRR 'A' FRM 7225-7235'. FAILED FRAC ON NBRR 'C'. FRAC NBRR 'A' & 'B' W/251,242 GAL GELLED FLUID W/376,240# 30/40 SAND & 8,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1281 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 16 | CALC_GOR | 9812 | CALC_MCF_GAS | 157 | CASING_PRESS | 200 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7225 ft. | # Of Holes: | 120 | Interval Bottom: | 7365 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 12/30/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 03/31/2014 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|