Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23651
Well Classification: GW Status: PA - 10/25/2024
Well Name/No:STEVE J #18-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/25/2024
FacilityID:283401LocationID:333001
Municipality/County:GREELEY / WELD #123Location:NWSE 18 5N66W 6
Field:WATTENBERG - #90750Elevation:4957 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2527FSL  2422 FELLat/Long: 40.399080 / -104.821940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.399080 / -104.821970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/25/2024             Measured TD: 7923 ft.    Vertical TD: 7609 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/25/2024
Wellbore PermitDIRECTIONAL
Permit #:20060065 Expiration Date:2/21/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1320 FSL  1320 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66W Footage: 1320 FSL  1320 FEL
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:5/20/2006
Spud Date:5/16/2006Spud Date Is:ACTUAL
Measured TD:7923 ft.Measured PB depth:7888 ft.
True Vertical TD:7609 ft.True Vertical PB depth:7574 ft.
Top PZ Location:Sec: Twp: Footage: 1320 FSL  1320 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66WFootage: 1320 FSL  1320 FEL
Log Types:DIL/GRGR/CCL/CBL, CDL/CNL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 447 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 447 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7916 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 913 ft., Bottom: 7916 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3793 ft.NN
SUSSEX4810 ft.NN
SHANNON5243 ft.NN
NIOBRARA7450 ft.NN
FORT HAYS7738 ft.NN
CODELL7759 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  AB - 10/25/2024                Interval Top: 7759 ft.    Interval Bottom: 7776 ft.

 Completed Information for Formation CODELL
1st Production Date:7/28/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2007
Treatment Summary:FRAC'D CODELL W/ 129,234 GALS OF SILVERSTIM WITH 28# GEL LOADING AND 270,840#'S OF 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 20
BTU_GAS 1282
CALC_BBLS_H2O 2
CALC_GOR 36000
CALC_MCF_GAS 72
CASING_PRESS 450
MCF_GAS 72
TUBING_PRESS 350
Perforation Data:
Interval Top:7759 ft.# Of Holes:68
Interval Bottom:7776 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/25/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No