Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23650
Well Classification: OW Status: PA - 10/22/2024
Well Name/No:STEVE J #18-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/22/2024
FacilityID:283402LocationID:333001
Municipality/County:GREELEY / WELD #123Location:NWSE 18 5N66W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2527FSL  2442 FELLat/Long: 40.399012 / -104.821930Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.399080 / -104.822020Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/14/2012
End Date: 5/14/2012
Reported: 5/29/2012
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/22/2024             Measured TD: 7669 ft.    Vertical TD: 7613 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/22/2024
Wellbore PermitDIRECTIONAL
Permit #:20060068 Expiration Date:2/21/2007
Proposed Top PZ Location:Sec:18 Twp: 5N 66W Footage: 1996 FSL  2083 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66W Footage: 1996 FSL  2083 FEL
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:5/14/2006
Spud Date:5/10/2006Spud Date Is:ACTUAL
Measured TD:7669 ft.Measured PB depth:7595 ft.
True Vertical TD:7613 ft.True Vertical PB depth:7538 ft.
Top PZ Location:Sec:18 Twp: 5N 66WFootage: 1996 FSL  2083 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66WFootage: 1996 FSL  2083 FEL
Log Types:GR/CCL/CBL, CDL/CNL/MI, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 430 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 430 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7657 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 2614 ft., Bottom: 7657 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3880 ft.NN
SUSSEX4570 ft.NN
SHANNON4980 ft.NN
NIOBRARA7191 ft.NN
FORT HAYS7487 ft.NN
CODELL7508 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/12/2022                 Interval Top: 7509 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation CODELL
1st Production Date:7/26/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2012
Treatment Summary:Frac'd the Codell w/ 141512 gals of Vistar and Slick Water 15% HCI with 246880#'s of Ottawa sand.
Formation Treatment
Treatment Date:7/24/2006
Treatment Summary:FRAC'D CODELL W/ 129,150 GALS OF SILVERSTIM W/32# GEL LOADING & 271,000# OF 20/40 OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 20
BTU_GAS 1246
CALC_GOR 6050
CASING_PRESS 450
MCF_GAS 121
TUBING_PRESS 300
Perforation Data:
Interval Top:7509 ft.# Of Holes:68
Interval Bottom:7526 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/22/2024                Interval Top: 7200 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/4/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 8
BTU_GAS 1252
CALC_BBLS_H2O 9
CALC_BBLS_OIL 8
CALC_GOR 17750
CALC_MCF_GAS 142
CASING_PRESS 613
GRAVITY_OIL 57
MCF_GAS 142
TUBING_PRESS 267
Perforation Data:
Interval Top:7200 ft.# Of Holes:116
Interval Bottom:7526 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/12/2022                 Interval Top: 7200 ft.    Interval Bottom: 7338 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/4/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2012
Treatment Summary:Frac'd the Niobrara w/ 165921 gals of Vistar and Slick Water with 250320#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7200 ft.# Of Holes:48
Interval Bottom:7338 ft.Hole Size:0.72 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/22/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No