|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/22/2024 Measured TD: 7669 ft. Vertical TD: 7613 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/22/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060068 | Expiration Date: | 2/21/2007 | | Proposed Top PZ Location: | Sec:18 Twp: 5N 66W | Footage: 1996 FSL 2083 FEL | | Bottom Hole Location: | Sec:18 Twp: 5N 66W | Footage: 1996 FSL 2083 FEL | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 |
| | |
| Wellbore Completed | | Completion Date: | 5/14/2006 | | Spud Date: | 5/10/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7669 ft. | Measured PB depth: | 7595 ft. | | True Vertical TD: | 7613 ft. | True Vertical PB depth: | 7538 ft. | | Top PZ Location: | Sec:18 Twp: 5N 66W | Footage: 1996 FSL 2083 FEL | | Bottom Hole Location: | Sec:18 Twp: 5N 66W | Footage: 1996 FSL 2083 FEL | | Log Types: | GR/CCL/CBL, CDL/CNL/MI, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 430 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 430 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7657 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 870, Top: 2614 ft., Bottom: 7657 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3880 ft. | | N | N | | SUSSEX | 4570 ft. | | N | N | | SHANNON | 4980 ft. | | N | N | | NIOBRARA | 7191 ft. | | N | N | | FORT HAYS | 7487 ft. | | N | N | | CODELL | 7508 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 7/12/2022 Interval Top: 7509 ft. Interval Bottom: 7526 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/26/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2012 | | Treatment Summary: | Frac'd the Codell w/ 141512 gals of Vistar and Slick Water 15% HCI with 246880#'s of Ottawa sand. | | Formation Treatment | | Treatment Date: | 7/24/2006 | | Treatment Summary: | FRAC'D CODELL W/ 129,150 GALS OF SILVERSTIM W/32# GEL LOADING & 271,000# OF 20/40 OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 20 | | BTU_GAS | 1246 | | CALC_GOR | 6050 | | CASING_PRESS | 450 | | MCF_GAS | 121 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7509 ft. | # Of Holes: | 68 | | Interval Bottom: | 7526 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/22/2024 Interval Top: 7200 ft. Interval Bottom: 7526 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/4/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 8 | | BTU_GAS | 1252 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 17750 | | CALC_MCF_GAS | 142 | | CASING_PRESS | 613 | | GRAVITY_OIL | 57 | | MCF_GAS | 142 | | TUBING_PRESS | 267 |
| | Perforation Data: | | Interval Top: | 7200 ft. | # Of Holes: | 116 | | Interval Bottom: | 7526 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 7/12/2022 Interval Top: 7200 ft. Interval Bottom: 7338 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/4/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2012 | | Treatment Summary: | Frac'd the Niobrara w/ 165921 gals of Vistar and Slick Water with 250320#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7200 ft. | # Of Holes: | 48 | | Interval Bottom: | 7338 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/22/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|