|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 2/20/2024 Measured TD: 7530 ft. Vertical TD: 7392 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 2/20/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060070 | Expiration Date: | 2/21/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1320 FNL 2600 FEL | | Bottom Hole Location: | Sec:25 Twp: 3N 68W | Footage: 1938 FNL 2600 FEL | | Proposed Depth/Form: | 7193 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 3/28/2006 | | Spud Date: | 3/23/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7530 ft. | Measured PB depth: | 7500 ft. | | True Vertical TD: | 7392 ft. | True Vertical PB depth: | 7362 ft. | | Top PZ Location: | Sec:25 Twp: 3N 68W | Footage: 1318 FNL 2610 FEL | | Bottom Hole Location: | Sec:25 Twp: 3N 68W | Footage: 1318 FNL 2610 FEL | | Log Types: | CBL,AILC,PEML,CNLD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 713 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 495, Top: 0 ft., Bottom: 713 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7512 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 505, Top: 3350 ft., Bottom: 7512 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3716 ft. | | N | N | | SUSSEX | 4174 ft. | | N | N | | SHANNON | 4707 ft. | | N | N | | NIOBRARA | 7101 ft. | | N | N | | FORT HAYS | 7344 ft. | | N | N | | CODELL | 7365 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/19/2011 Interval Top: 7366 ft. Interval Bottom: 7388 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/18/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | Re-Frac 12/13/2010 w/ 192,443 gal SW w/ 150,080# 40/70 & 4,000# SB Excel | | Formation Treatment | | Treatment Date: | 4/17/2006 | | Treatment Summary: | 145,696 GALS FLUID & 115,140 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 45 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 135 | | CASING_PRESS | 375 | | GRAVITY_OIL | 48 | | MCF_GAS | 135 |
| | Perforation Data: | | Interval Top: | 7366 ft. | # Of Holes: | 66 | | Interval Bottom: | 7388 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/20/2024 Interval Top: 7120 ft. Interval Bottom: 7388 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/16/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | NB Perf 7120-7226 Holes 66 Size 0.42 CD Perf 7366-7388 Holes 66 Size 0.45 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 3200 | | CALC_MCF_GAS | 48 | | CASING_PRESS | 383 | | GRAVITY_OIL | 49 | | MCF_GAS | 48 | | TUBING_PRESS | 345 |
| | Perforation Data: | | Interval Top: | 7120 ft. | # Of Holes: | 132 | | Interval Bottom: | 7388 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/21/2011 Interval Top: 7120 ft. Interval Bottom: 7226 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/16/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | Frac w/ 250 gal 15% HCl & 228,663 gal SW w/ 201,080# 40/70 & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7120 ft. | # Of Holes: | 66 | | Interval Bottom: | 7226 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/20/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|