|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/25/2024 Measured TD: 7942 ft. Vertical TD: 7636 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/25/2024 | | Wellbore Permit | | | Permit #: | 20060069 | Expiration Date: | 2/15/2007 | | Proposed Top PZ Location: | Sec:18 Twp: 5N 66W | Footage: 2064 FSL 759 FEL | | Bottom Hole Location: | Sec:18 Twp: 5N 66W | Footage: 2064 FSL 759 FEL | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE |
| | |
| Wellbore Completed | | Completion Date: | 5/25/2006 | | Spud Date: | 5/21/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7942 ft. | Measured PB depth: | 7667 ft. | | True Vertical TD: | 7636 ft. | True Vertical PB depth: | 7361 ft. | | Top PZ Location: | Sec:18 Twp: 5N 66W | Footage: 2064 FSL 759 FEL | | Bottom Hole Location: | Sec:18 Twp: 5N 66W | Footage: 2064 FSL 759 FEL | | Log Types: | GR/CCL/CBL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 459 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 459 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7932 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 960, Top: 1854 ft., Bottom: 7932 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 2910 ft. | | N | N | | SUSSEX | 4732 ft. | | N | N | | SHANNON | 5130 ft. | | N | N | | NIOBRARA | 7440 ft. | | N | N | | FORT HAYS | 7740 ft. | | N | N | | CODELL | 7762 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 6/24/2022 Interval Top: 7764 ft. Interval Bottom: 7780 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/30/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/16/2011 | | Treatment Summary: | Re-Frac'd codell w/ 141932 gals of Slick Water, Vistar, and 15% HCI with 248741#'s of Ottawa sand. | | Formation Treatment | | Treatment Date: | 7/28/2006 | | Treatment Summary: | FRAC'D CODELL W/ 126,448 GALS OF SILVERSTIM W/ 24# GEL LOADING & 271,320# OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 15 | | BTU_GAS | 1246 | | CALC_GOR | 7600 | | CASING_PRESS | 300 | | MCF_GAS | 114 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7764 ft. | # Of Holes: | 64 | | Interval Bottom: | 7780 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/25/2024 Interval Top: 7452 ft. Interval Bottom: 7780 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 12 | | BTU_GAS | 1289 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 17417 | | CALC_MCF_GAS | 209 | | CASING_PRESS | 998 | | GRAVITY_OIL | 56 | | MCF_GAS | 209 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7452 ft. | # Of Holes: | 112 | | Interval Bottom: | 7780 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/24/2022 Interval Top: 7452 ft. Interval Bottom: 7590 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/16/2011 | | Treatment Summary: | Frac'd Niobrara w/ 167143 gals of Slick Water and Vistar with 251859#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7452 ft. | # Of Holes: | 48 | | Interval Bottom: | 7590 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|