|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/15/2018 Measured TD: 7910 ft. Vertical TD: 7795 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/15/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | 20070904 | Expiration Date: | 3/27/2008 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1338 FNL 2652 FWL | Bottom Hole Location: | Sec:18 Twp: 3N 67W | Footage: 1338 FNL 2652 FWL | Proposed Depth/Form: | 7795 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ENW&WN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 625 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 625 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7902 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 740, Top: 2640 ft., Bottom: 7902 ft. |
| | |
Wellbore Completed | Completion Date: | 3/2/2006 | Spud Date: | 2/24/2006 | Spud Date Is: | ACTUAL | Measured TD: | 7910 ft. | Measured PB depth: | 7888 ft. | True Vertical TD: | 7795 ft. | True Vertical PB depth: | 7773 ft. | Top PZ Location: | Sec: Twp: | Footage: 1338 FNL 2652 FWL | Bottom Hole Location: | Sec:18 Twp: 3N 67W | Footage: 1338 N 2652 W | Log Types: | CBL/GR/CCL, PE-ML/GR, PE-CAL, PE-AI/LC, MUDLOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 625 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 625 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7902 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 2838 ft., Bottom: 7902 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4050 ft. | | N | N | SHANNON | 4216 ft. | | N | N | NIOBRARA | 7027 ft. | | N | N | FORT HAYS | 7274 ft. | | N | N | CODELL | 7294 ft. | | N | N | J SAND | 7735 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/15/2018 Interval Top: 7744 ft. Interval Bottom: 7778 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/15/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/26/2007 | Treatment Summary: | 168,000 GAL OF SLICKWATER, 116,540# 30/50 SAND, 4000# OF 20/40 SUPER LC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7744 ft. | # Of Holes: | 46 | Interval Bottom: | 7778 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 8/15/2018 Interval Top: 7296 ft. Interval Bottom: 7318 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/16/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/15/2006 | Treatment Summary: | NO ADDITIONAL TREATMENT |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/15/2006 | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 30 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 30 | CALC_GOR | 2200 | CALC_MCF_GAS | 66 | CASING_PRESS | 644 | GRAVITY_OIL | 47 | MCF_GAS | 66 | TUBING_PRESS | 429 |
| Perforation Data: | Interval Top: | 7296 ft. | # Of Holes: | 66 | Interval Bottom: | 7318 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 10/16/2007 Interval Top: 7296 ft. Interval Bottom: 7778 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 10/15/2007 | Choke Size: | 0.438 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/2/2006 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7724 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/16/2007 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1328 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 4 | CALC_GOR | 7000 | CALC_MCF_GAS | 28 | CASING_PRESS | 350 | GRAVITY_OIL | 51 | TUBING_PRESS | 280 |
| Perforation Data: | Interval Top: | 7296 ft. | # Of Holes: | 112 | Interval Bottom: | 7778 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 08/15/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|