Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23591
Well Classification: OW Status: TA - 8/1/2025
Well Name/No:PETTINGER #34-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date8/1/2025
FacilityID:282974LocationID:305860
County:WELD #123Location:SWSE 2 6N64W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  2160 FELLat/Long: 40.509223 / -104.515491Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.509440 / -104.515500Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 8/1/2025             Measured TD: 7168 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 8/1/2025
Wellbore Permit
Permit #:20055032 Expiration Date:1/30/2007
Proposed Depth/Form:8120 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SE/4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 3620 ft., Bottom: 6620 ft.

Wellbore Completed
Completion Date:11/28/2006
Spud Date:11/24/2006Spud Date Is:ACTUAL
Measured TD:7168 ft.Measured PB depth:7111 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 854 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 854 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7154 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 190 ft., Bottom: 7154 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6660 ft.NN
FORT HAYS6919 ft.NN
CODELL6951 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  TA - 8/1/2025                  Interval Top: 6953 ft.    Interval Bottom: 6963 ft.

 Completed Information for Formation CODELL
1st Production Date:1/25/2007Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2006
Treatment Summary:FRAC'D CODELL W/ 1816 BBLS OF VISTAR 20# FLUID; 176920# OF 20/40 WHITE SAND, & 8000# OF SUPER LC 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 25
BTU_GAS 1304
CALC_BBLS_H2O 25
CALC_BBLS_OIL 25
CALC_GOR 1840
CALC_MCF_GAS 46
CASING_PRESS 1900
GRAVITY_OIL 41
MCF_GAS 46
TUBING_PRESS 1900
Perforation Data:
Interval Top:6953 ft.# Of Holes:30
Interval Bottom:6963 ft.Hole Size:0.34 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
06/30/2025
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)141
GOR4548
GOR DeterminationBOE
Average BOE per Day0.152
Average MCFE per Day0.869

 Federal Financial Assurance  i 

 Tribal Well  i No