|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/9/2017 Measured TD: 7700 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/9/2017 | | Wellbore Permit | | | Permit #: | 20054687 | Expiration Date: | 1/9/2007 | | Proposed Depth/Form: | 7695 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2SW |
| | |
| Wellbore Completed | | Completion Date: | 5/12/2006 | | Spud Date: | 5/7/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7700 ft. | Measured PB depth: | 7660 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,CDCN,DIGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 902 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 902 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7670 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 3755 ft., Bottom: 7700 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4474 ft. | | N | N | | SHANNON | 4977 ft. | | N | N | | NIOBRARA | 7249 ft. | | N | N | | FORT HAYS | 7488 ft. | | N | N | | CODELL | 7509 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/19/2011 Interval Top: 7511 ft. Interval Bottom: 7531 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/1/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 213,061 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel, 0# . | | Formation Treatment | | Treatment Date: | 5/31/2006 | | Treatment Summary: | 145,795 GALS FLUID & 115,560 KBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 38 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 2790 | | CALC_MCF_GAS | 106 | | CASING_PRESS | 905 | | GRAVITY_OIL | 48 | | MCF_GAS | 106 | | TUBING_PRESS | 695 |
| | Perforation Data: | | Interval Top: | 7511 ft. | # Of Holes: | 60 | | Interval Bottom: | 7531 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/9/2017 Interval Top: 7302 ft. Interval Bottom: 7531 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | CDRF-NBREC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7483 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 17 | | BTU_GAS | 1261 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 5765 | | CALC_MCF_GAS | 98 | | CASING_PRESS | 1175 | | GRAVITY_OIL | 49 | | MCF_GAS | 98 | | TUBING_PRESS | 1010 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 114 | | Interval Bottom: | 7531 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/7/2011 Interval Top: 7302 ft. Interval Bottom: 7390 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 233,880 gal Slickwater w/ 201,540# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 54 | | Interval Bottom: | 7390 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/09/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|