Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23495
Well Classification: OW Status: TA - 4/1/2025
Well Name/No:SWARTS #1-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date4/1/2025
FacilityID:282457LocationID:305799
County:WELD #123Location:NENE 6 2N67W 6
Field:WATTENBERG - #90750Elevation:4840 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:743FNL  567 FELLat/Long: 40.173248 / -104.925662Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.173290 / -104.925420Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/14/2011
End Date: 9/14/2011
Reported: 10/25/2011
Prior to rule 205A.b.(2)(A)
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 4/1/2025             Measured TD: 7924 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 4/1/2025
Wellbore Permit
Permit #:20085468 Expiration Date:8/27/2009
Proposed Depth/Form:7924 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 697 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 697 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7879 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 3230 ft., Bottom: 7879 ft.

Wellbore Completed
Completion Date:4/23/2006
Spud Date:4/18/2006Spud Date Is:ACTUAL
Measured TD:7924 ft.Measured PB depth:7868 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGL,CDCN,CBL,ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 697 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7882 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 3230 ft., Bottom: 7882 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4150 ft.NN
SHANNON4668 ft.NN
NIOBRARA7052 ft.NN
FORT HAYS7284 ft.NN
CODELL7304 ft.NN
J SAND7738 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  TA - 1/1/2017                  Interval Top: 7740 ft.    Interval Bottom: 7788 ft.

 Completed Information for Formation J SAND
1st Production Date:8/24/2009Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:SET SAND PLUG @ 7580
Formation Treatment
Treatment Date:8/12/2009
Treatment Summary:Frac J-sand Down 4.5" csg w/167,551 gal SW containing 115,740 # 40/70 & 4,000# 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7740 ft.# Of Holes:50
Interval Bottom:7788 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OG                     Status:  CM - 10/13/2011                Interval Top: 7306 ft.    Interval Bottom: 7326 ft.

 Completed Information for Formation CODELL
1st Production Date:9/23/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2011
Treatment Summary:Re-Frac Codell down 4-1/2" Csg w/ 201,854 gal Slickwater w/ 150,260# 40/70, 4,000# SuperLC.
Formation Treatment
Treatment Date:5/9/2006
Treatment Summary:145,364 GALS FLUID & 115,180 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 30
CALC_BBLS_H2O 0
CALC_BBLS_OIL 30
CALC_GOR 2600
CALC_MCF_GAS 78
CASING_PRESS 460
GRAVITY_OIL 48
MCF_GAS 78
Perforation Data:
Interval Top:7306 ft.# Of Holes:60
Interval Bottom:7326 ft.Hole Size:0.45 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 9/25/2009                 Interval Top: 7306 ft.    Interval Bottom: 7788 ft.

 Completed Information for Formation J-CODELL
1st Production Date:8/24/2009Choke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/12/2009
Treatment Summary:J SAND recomplete.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/25/2009Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 5
BTU_GAS 1149
CALC_BBLS_OIL 5
CALC_GOR 33800
CALC_MCF_GAS 169
CASING_PRESS 550
GRAVITY_OIL 50
MCF_GAS 169
Perforation Data:
Interval Top:7306 ft.# Of Holes:110
Interval Bottom:7788 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 5/1/2025                  Interval Top: 7100 ft.    Interval Bottom: 7326 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/23/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2011
Treatment Summary:CDRF-NBREC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 25
BTU_GAS 1144
CALC_BBLS_OIL 25
CALC_GOR 3960
CALC_MCF_GAS 99
CASING_PRESS 1396
GRAVITY_OIL 50
MCF_GAS 99
TUBING_PRESS 787
Perforation Data:
Interval Top:7100 ft.# Of Holes:120
Interval Bottom:7326 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 10/14/2011                Interval Top: 7100 ft.    Interval Bottom: 7188 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/23/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2011
Treatment Summary:Frac Niobrara B & C down 4-1/2" Csg w/ 750 gal 15% HCl & 222,209 gal Slickwater w/ 157,120# 40/70, 4,000# SuperLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7100 ft.# Of Holes:60
Interval Bottom:7188 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
11/19/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
08/31/2024
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No