|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/12/2020 Measured TD: 7280 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/12/2020 | | Wellbore Permit | | | Permit #: | 20054366 | Expiration Date: | 1/3/2007 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW1/4 |
| | |
| Wellbore Completed | | Completion Date: | 4/9/2006 | | Spud Date: | 4/5/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7280 ft. | Measured PB depth: | 7258 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION GUARD LOG GAMMA RAY; COMPENSATED DENSITY COMPENSATED NEUTRON GAMMA RAY; CEMENT BOND-VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 444 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 444 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7279 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 6268 ft., Bottom: 7279 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3484 ft. | 3720 ft. | N | N | | SUSSEX | 4165 ft. | 4380 ft. | N | N | | SHANNON | 4558 ft. | 4620 ft. | N | N | | NIOBRARA | 6790 ft. | 7030 ft. | N | N | | FORT HAYS | 7089 ft. | 7111 ft. | N | N | | CODELL | 7112 ft. | 7136 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 10/30/2017 Interval Top: 7114 ft. Interval Bottom: 7130 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/12/2006 | | Treatment Summary: | FRAC CODELL W/ 3333 BBLS FLUID (476 BBLS 7% KCL W/R, 476 BBLS SLICK W/R PAD AND 2381 BBLS SILVER STEM FLUID) AND 270,000# 20/40 SAND. AVERAGE PRESSURE 3533#, AVERAGE RATE 19.8 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 64 | | Interval Bottom: | 7130 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/12/2020 Interval Top: 6794 ft. Interval Bottom: 7130 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/24/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/9/2006 | | Treatment Summary: | COMMINGLE NIOBRARA AND CODELL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 4 | | BTU_GAS | 1328 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 5500 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 1150 | | GRAVITY_OIL | 45 | | MCF_GAS | 22 | | TUBING_PRESS | 700 |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 222 | | Interval Bottom: | 7130 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/30/2017 Interval Top: 6794 ft. Interval Bottom: 7010 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/30/2012 | Treatment End Date: | 8/30/2012 | | Treatment Summary: | Plug & Perf: Refrac'd Niobrara w/ 23.8 bbls 15% HCL; 200,250# 40/70; 4000# 20/40 SLC; 5892 bbls Slickwater | | Total fluid used in treatment (bbls): | 5916 | Max pressure during treatment (psi): | 5312 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 977 | | Fresh water used in treatment (bbls): | 5892 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204250 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/12/2006 | | Treatment Summary: | FRAC NIOBRARA W/ 4167 BBLS FLUID, (1667 BBLS SLICK WATER PAD AND 2500 BBLS SILVER STEM FLUID) AND 238,000# 30/50 SAND 12,000# 12/20 RESIN COATED SAND. AVERAGE PRESSURE 4590#, AVERAGE RATE 49.7BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 158 | | Interval Bottom: | 7010 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/12/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|