|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/19/2017 Measured TD: 7741 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/19/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 20085978 | Expiration Date: | 10/1/2009 | | Proposed Depth/Form: | 7741 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 845 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 845 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7763 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 565, Top: 4010 ft., Bottom: 7763 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/12/2006 | | Spud Date: | 1/5/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7741 ft. | Measured PB depth: | 7737 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CND, AIL, ML, GR, ML, CBL, CLCV | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 845 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 845 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7763 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 565, Top: 4010 ft., Bottom: 7763 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4468 ft. | | N | N | | NIOBRARA | 6890 ft. | | N | N | | FORT HAYS | 7134 ft. | | N | N | | CODELL | 7158 ft. | | N | N | | J SAND | 7614 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 12/19/2017 Interval Top: 7614 ft. Interval Bottom: 7664 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/8/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2011 | | Treatment Summary: | SET SAND PLUG @ 7330'. HOLE SIZE N/A | | Formation Treatment | | Treatment Date: | 11/12/2008 | | Treatment Summary: | PERF INTERVALS: 7614-7630', 7642-7664'. 76 PERFORATIONS. 161028 GAL FLUID, 116040 LBS 30/50, 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7614 ft. | # Of Holes: | 76 | | Interval Bottom: | 7664 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/29/2011 Interval Top: 7158 ft. Interval Bottom: 7172 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/25/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/25/2011 | | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 199,962 gal Slickwater w/ 151,200# 40/70, 4,000# SB Excel. | | Formation Treatment | | Treatment Date: | 1/24/2006 | | Treatment Summary: | NO ADDITONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 26 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 6000 | | CALC_MCF_GAS | 159 | | CASING_PRESS | 367 | | GRAVITY_OIL | 51 | | MCF_GAS | 159 | | TUBING_PRESS | 142 |
| | Perforation Data: | | Interval Top: | 7158 ft. | # Of Holes: | 56 | | Interval Bottom: | 7172 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/17/2008 Interval Top: 7158 ft. Interval Bottom: 7664 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 12/8/2008 | Choke Size: | 0.531 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2006 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7596 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/17/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 3 | | BTU_GAS | 1176 | | CALC_GOR | 25333 | | CASING_PRESS | 780 | | GRAVITY_OIL | 50 | | MCF_GAS | 76 | | TUBING_PRESS | 480 |
| | Perforation Data: | | Interval Top: | 7158 ft. | # Of Holes: | 132 | | Interval Bottom: | 7664 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/19/2017 Interval Top: 6890 ft. Interval Bottom: 7172 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/8/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/25/2011 | | Treatment Summary: | CDRF-NBREC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/25/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 17 | | BTU_GAS | 1163 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 7176 | | CALC_MCF_GAS | 122 | | CASING_PRESS | 448 | | GRAVITY_OIL | 52 | | MCF_GAS | 122 |
| | Perforation Data: | | Interval Top: | 6890 ft. | # Of Holes: | 120 | | Interval Bottom: | 7172 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/29/2011 Interval Top: 6890 ft. Interval Bottom: 7026 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/8/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/25/2011 | | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 241,212 gal Slickwater w/ 200,880# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6890 ft. | # Of Holes: | 64 | | Interval Bottom: | 7026 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/19/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|