Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23438
Well Classification: OW Status: PA - 12/19/2017
Well Name/No:MOSER #16-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/19/2017
FacilityID:281831LocationID:305754
County:WELD #123Location:SESE 4 2N65W 6
Field:WATTENBERG - #90750Elevation:4853 ft.
Planned Location:496FSL  482 FELLat/Long: 40.161858 / -104.661036Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.161900 / -104.661090Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/25/2011
End Date: 10/25/2011
Reported: 12/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/19/2017             Measured TD: 7741 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/19/2017
Wellbore PermitDRIFTED
Permit #:20085978 Expiration Date:10/1/2009
Proposed Depth/Form:7741 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 845 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 595, Top: 0 ft., Bottom: 845 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7763 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 565, Top: 4010 ft., Bottom: 7763 ft.

Wellbore Completed
Completion Date:1/12/2006
Spud Date:1/5/2006Spud Date Is:ACTUAL
Measured TD:7741 ft.Measured PB depth:7737 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CND, AIL, ML, GR, ML, CBL, CLCV
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 845 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 595, Top: 0 ft., Bottom: 845 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7763 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 4010 ft., Bottom: 7763 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4468 ft.NN
NIOBRARA6890 ft.NN
FORT HAYS7134 ft.NN
CODELL7158 ft.NN
J SAND7614 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 12/19/2017                Interval Top: 7614 ft.    Interval Bottom: 7664 ft.

 Completed Information for Formation J SAND
1st Production Date:12/8/2008Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2011
Treatment Summary:SET SAND PLUG @ 7330'. HOLE SIZE N/A
Formation Treatment
Treatment Date:11/12/2008
Treatment Summary:PERF INTERVALS: 7614-7630', 7642-7664'. 76 PERFORATIONS. 161028 GAL FLUID, 116040 LBS 30/50, 4000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7614 ft.# Of Holes:76
Interval Bottom:7664 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/29/2011                Interval Top: 7158 ft.    Interval Bottom: 7172 ft.

 Completed Information for Formation CODELL
1st Production Date:1/25/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/2011
Treatment Summary:Re-Frac Codell down 4-1/2" Csg w/ 199,962 gal Slickwater w/ 151,200# 40/70, 4,000# SB Excel.
Formation Treatment
Treatment Date:1/24/2006
Treatment Summary:NO ADDITONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 26
CALC_BBLS_H2O 0
CALC_BBLS_OIL 26
CALC_GOR 6000
CALC_MCF_GAS 159
CASING_PRESS 367
GRAVITY_OIL 51
MCF_GAS 159
TUBING_PRESS 142
Perforation Data:
Interval Top:7158 ft.# Of Holes:56
Interval Bottom:7172 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 12/17/2008                Interval Top: 7158 ft.    Interval Bottom: 7664 ft.

 Completed Information for Formation J-CODELL
1st Production Date:12/8/2008Choke Size:0.531 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2006
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7596 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
BTU_GAS 1176
CALC_GOR 25333
CASING_PRESS 780
GRAVITY_OIL 50
MCF_GAS 76
TUBING_PRESS 480
Perforation Data:
Interval Top:7158 ft.# Of Holes:132
Interval Bottom:7664 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/19/2017                Interval Top: 6890 ft.    Interval Bottom: 7172 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/8/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/2011
Treatment Summary:CDRF-NBREC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 17
BTU_GAS 1163
CALC_BBLS_OIL 17
CALC_GOR 7176
CALC_MCF_GAS 122
CASING_PRESS 448
GRAVITY_OIL 52
MCF_GAS 122
Perforation Data:
Interval Top:6890 ft.# Of Holes:120
Interval Bottom:7172 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/29/2011                Interval Top: 6890 ft.    Interval Bottom: 7026 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/8/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 241,212 gal Slickwater w/ 200,880# 40/70, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6890 ft.# Of Holes:64
Interval Bottom:7026 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/19/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No