Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23377
Well Classification: OW Status: PA - 6/13/2024
Well Name/No:WELLS RANCH #43-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/13/2024
FacilityID:281283LocationID:305705
County:WELD #123Location:NESE 14 5N63W 6
Field:WATTENBERG - #90750Elevation:4630 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2010FSL  640 FELLat/Long: 40.397386 / -104.396440Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.397440 / -104.396690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 6/13/2024             Measured TD: 6742 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 6/13/2024
Wellbore Permit
Permit #:20053748 Expiration Date:11/13/2006
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 3200 ft., Bottom: 6200 ft.

Wellbore Completed
Completion Date:12/30/2005
Spud Date:12/20/2005Spud Date Is:ACTUAL
Measured TD:6742 ft.Measured PB depth:6722 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/COMP.NEUTRON/DUAL INDUCTION; CBL
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 402 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 402 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6722 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 5682 ft., Bottom: 6722 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5682 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 2618 ft., Bottom: 5682 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3440 ft.NN
SUSSEX3950 ft.NN
SHANNON4255 ft.NN
NIOBRARA6303 ft.NN
FORT HAYS6508 ft.NN
CODELL6556 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/1/2006                  Interval Top: 6558 ft.    Interval Bottom: 6566 ft.

 Completed Information for Formation CODELL
1st Production Date:3/14/2006Choke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/13/2006
Treatment Summary:BJ SERVICES FRACED USING 2574 BBL OF 20# VISTAR GEL, 217,300# OF 20/40 FRAC SAND, AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6551 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 24
BTU_GAS 1394
CALC_BBLS_H2O 1
CALC_BBLS_OIL 24
CALC_GOR 1000
CALC_MCF_GAS 24
CASING_PRESS 1600
GRAVITY_OIL 44
MCF_GAS 24
TUBING_PRESS 1500
Perforation Data:
Interval Top:6558 ft.# Of Holes:24
Interval Bottom:6566 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/13/2024                 Interval Top: 6308 ft.    Interval Bottom: 6566 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/20/2008Choke Size:0.640 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/2005
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6544 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 23
BTU_GAS 1340
CALC_BBLS_OIL 23
CALC_GOR 3609
CALC_MCF_GAS 83
CASING_PRESS 1100
GRAVITY_OIL 43
MCF_GAS 83
TUBING_PRESS 700
Perforation Data:
Interval Top:6308 ft.# Of Holes:56
Interval Bottom:6566 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/1/2008                 Interval Top: 6308 ft.    Interval Bottom: 6396 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2008
Treatment Summary:PERF'D NBRR "A"6308-6312 (8 HOLES) &NBRR"B"6388-6396(24HOLES) FRAC'D NBRR W/ 24 BBLS OF 15%HCL,1668 BBLS SLICKWATER PAD,146 BBLS OF SILVERSTIM 22#PAD, 2211 BBLS OF SILVERSTIM 22# FLUIDSYSTEM, 238720 LBS 30/50 WHITE SAND & 12000 LBS OF SBEXCEL 20/40 RCP
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6308 ft.# Of Holes:32
Interval Bottom:6396 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No