Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23335
Well Classification: GW Status: PA - 1/27/2021
Well Name/No:STANLEY OLSON #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/27/2021
FacilityID:281026LocationID:336384
Municipality/County:FIRESTONE / WELD #123Location:SWNE 14 2N68W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1751FNL  1469 FELLat/Long: 40.141136 / -104.966446Lat/Long Source: Calculated From Footages
As Drilled Location:1744 FNL  1474 FELLat/Long: 40.141220 / -104.966290Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/27/2021             Measured TD: 8202 ft.    Vertical TD: 8101 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/27/2021
Wellbore PermitDIRECTIONAL
Permit #:20053602 Expiration Date:10/30/2006
Proposed Top PZ Location:Sec:14 Twp: 2N 68W Footage: 1945 FNL  667 FEL
Bottom Hole Location:Sec:14 Twp: 2N 68W Footage: 1945 FNL  667 FEL
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S1/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:4/3/2006
Spud Date:3/27/2006Spud Date Is:ACTUAL
Measured TD:8202 ft.Measured PB depth:8185 ft.
True Vertical TD:8101 ft.True Vertical PB depth:8084 ft.
Top PZ Location:Sec:14 Twp: 2N 68WFootage: 1945 FNL  667 FEL
Bottom Hole Location:Sec:14 Twp: 2N 68WFootage: 1945 FNL  667 FEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 627 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 627 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8185 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6580 ft., Bottom: 8185 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5090 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 3960 ft., Bottom: 5090 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4309 ft.4360 ft.NN
SHANNON4838 ft.4860 ft.NN
NIOBRARA7236 ft.7400 ft.NN
CODELL7515 ft.7534 ft.NN
J SAND7944 ft.8000 ft.NN
DAKOTA8123 ft.8155 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/27/2021                 Interval Top: 7948 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation J SAND
1st Production Date:12/16/2006Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:FRAC W/137,000 GAL SILVER STIM FLUID & 300,000# 30/50 SAND. FLOWED BACK UNTIL DEAD. SPOT SAND PLUG. WILL CLEAN SAND & COMMINGLE AT A LATER DATE.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7948 ft.# Of Holes:60
Interval Bottom:7978 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/5/2007                  Interval Top: 7516 ft.    Interval Bottom: 7534 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/24/2006
Treatment Summary:FRAC'D WITH 199399 GAL SLICK WATER WITH 195820# 30/50 FRAC SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7516 ft.# Of Holes:36
Interval Bottom:7534 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/25/2007                Interval Top: 7296 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:12/16/2006Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/22/2007
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7913 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2006Test Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 36
CALC_GOR 4167
CALC_MCF_GAS 150
Perforation Data:
Interval Top:7296 ft.# Of Holes:148
Interval Bottom:7978 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/27/2021                 Interval Top: 7296 ft.    Interval Bottom: 7534 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/16/2006Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:FRAC W/199,399 GAL SLICKWATER & 195,820# 30/50 FRAC SAND. THE WELL WAS FLOWED BACK AND STARTED ON PRODUCTION.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7296 ft.# Of Holes:88
Interval Bottom:7534 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/13/2006                 Interval Top: 7296 ft.    Interval Bottom: 7396 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/24/2007
Treatment Summary:FRAC'D WITH 199399 GAL SLICK WATER WITH 195820# 30/50 FRAC SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7296 ft.# Of Holes:52
Interval Bottom:7396 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/27/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No