|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2020 Measured TD: 7765 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2020 | | Wellbore Permit | | | Permit #: | 20080132 | Expiration Date: | 3/17/2009 | | Proposed Depth/Form: | 7765 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 810 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 810 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7768 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 820, Top: 3750 ft., Bottom: 7768 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/29/2005 | | Spud Date: | 11/8/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7765 ft. | Measured PB depth: | 7736 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGR, CNCD, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 810 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 810 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7768 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 820, Top: 3750 ft., Bottom: 7768 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4347 ft. | | N | N | | NIOBRARA | 6856 ft. | | N | N | | FORT HAYS | 7114 ft. | | N | N | | CODELL | 7137 ft. | | N | N | | J SAND | 7592 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 10/1/2019 Interval Top: 7594 ft. Interval Bottom: 7630 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/16/2008 | | Treatment Summary: | PERF JSND 7594-7600 & 7610-7630 (3SPF). FRAC JSND W/ 159,376 GAL FLUID & 116,720# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7594 ft. | # Of Holes: | 78 | | Interval Bottom: | 7630 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: SI - 7/1/2020 Interval Top: 7138 ft. Interval Bottom: 7150 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/29/2005 | | Treatment Summary: | CODELL 141882 GAL FLUID 115120 LBS 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7104 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/29/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 16 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 8000 | | CALC_MCF_GAS | 129 | | CASING_PRESS | 223 | | GRAVITY_OIL | 56 | | MCF_GAS | 129 | | TUBING_PRESS | 76 |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 48 | | Interval Bottom: | 7150 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/19/2008 Interval Top: 7138 ft. Interval Bottom: 7630 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 4/30/2008 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/29/2005 | | Treatment Summary: | CODL PERFS 11/28/05 > 7138-7150 (3SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7550 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/19/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1115 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 20 | | CASING_PRESS | 800 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 114 | | Interval Bottom: | 7630 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|