|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2022 Measured TD: 7711 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2022 | Wellbore Permit | | Permit #: | 20052954 | Expiration Date: | 9/27/2006 | Proposed Depth/Form: | 7720 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/28/2005 | Spud Date: | 10/20/2005 | Spud Date Is: | ACTUAL | Measured TD: | 7711 ft. | Measured PB depth: | 7651 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL INDUCTION/ DENSITY NEUTRON & CCL GAMMA RAY/CEMENT BOND | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1118 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 785, Top: 0 ft., Bottom: 1118 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7693 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 6646 ft., Bottom: 7693 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6690 ft. | 6930 ft. | N | N | FORT HAYS | 6998 ft. | 7040 ft. | N | N | D SAND | 7412 ft. | 7429 ft. | N | N | J SAND | 7470 ft. | 7520 ft. | N | N |
Formation DSND Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 7416 ft. Interval Bottom: 7424 ft. Completed Information for Formation D SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | D SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/28/2005 | Treatment Summary: | 500 GALLONS 15% HCL ACID, FRAC W/ 895 BBLS DYNA FLOW, 59,095# 20/40 SAND, 40 TONS CO2. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7367 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/5/2006 | Test Method: | PLUNGER LIFT | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 16 | BTU_GAS | 1380 | CASING_PRESS | 520 | GRAVITY_OIL | 40 | MCF_GAS | 42 | TUBING_PRESS | 440 |
| Perforation Data: | Interval Top: | 7416 ft. | # Of Holes: | 25 | Interval Bottom: | 7424 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 307 |
Total Gas Produced (MCF) | 1555 |
GOR | 5065 |
GOR Determination | BOE |
Average BOE per Day | 1.574 |
Average MCFE per Day | 9.116 |
Federal Financial Assurance | i | |
|
|