Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23144
Well Classification: OW Status: PA - 5/10/2024
Well Name/No:SCHMERGE #43-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/10/2024
FacilityID:279123LocationID:305555
County:WELD #123Location:NESE 4 5N67W 6
Field:WATTENBERG - #90750Elevation:4890 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2042FSL  658 FELLat/Long: 40.426843 / -104.889956Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.426920 / -104.890140Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/10/2012
End Date: 10/10/2012
Reported: 12/7/2012
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/10/2024             Measured TD: 7410 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/10/2024
Wellbore PermitDRIFTED
Permit #:20052305 Expiration Date:8/1/2006
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4

Wellbore Completed
Completion Date:8/24/2005
Spud Date:8/20/2005Spud Date Is:ACTUAL
Measured TD:7410 ft.Measured PB depth:7370 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON, DUAL INDUCTION, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 166 ft., Bottom: 7385 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1470 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 166 ft., Bottom: 1470 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3550 ft.NN
SUSSEX4038 ft.NN
SHANNON4597 ft.NN
NIOBRARA6879 ft.NN
FORT HAYS7153 ft.NN
CODELL7192 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/3/2013                  Interval Top: 7194 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/15/2005
Treatment Summary:BJ SERVICES FRACED USING 2678 BBL OF 20# VISTAR GEL, 217,580# OF 20/40 FRAC SAND AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 17
BTU_GAS 1361
CALC_BBLS_H2O 2
CALC_BBLS_OIL 17
CALC_GOR 4529
CALC_MCF_GAS 77
CASING_PRESS 500
GRAVITY_OIL 47
MCF_GAS 77
TUBING_PRESS 350
Perforation Data:
Interval Top:7194 ft.# Of Holes:24
Interval Bottom:7204 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/10/2024                 Interval Top: 6902 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2012Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BBLS_OIL 23
BTU_GAS 1277
CALC_BBLS_H2O 37
CALC_BBLS_OIL 23
CALC_GOR 130
CALC_MCF_GAS 3
CASING_PRESS 881
GRAVITY_OIL 48
MCF_GAS 3
TUBING_PRESS 606
Perforation Data:
Interval Top:6902 ft.# Of Holes:52
Interval Bottom:7204 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2013                  Interval Top: 6092 ft.    Interval Bottom: 7026 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/8/2012Treatment End Date:10/8/2012
Treatment Summary:Niobrara ""B"" Bench @ 7018'-7026' Niobrara ""A"" Bench @ 6902' - 6904'
Total fluid used in treatment (bbls):2265Max pressure during treatment (psi):4998
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2265Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6092 ft.# Of Holes:28
Interval Bottom:7026 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/10/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No