Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23143
Well Classification: OW Status: PA - 4/7/2025
Well Name/No:SCHMERGE #44-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/7/2025
FacilityID:279124LocationID:305554
County:WELD #123Location:SESE 4 5N67W 6
Field:WATTENBERG - #90750Elevation:4920 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:682FSL  658 FELLat/Long: 40.423113 / -104.890326Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.423140 / -104.890420Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2012
End Date: 10/9/2012
Reported: 12/7/2012
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/7/2025             Measured TD: 7418 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/7/2025
Wellbore PermitDRIFTED
Permit #:Expiration Date:8/1/2006
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4

Wellbore Completed
Completion Date:8/19/2005
Spud Date:8/14/2005Spud Date Is:ACTUAL
Measured TD:7418 ft.Measured PB depth:7375 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON, DUAL INDUCTION, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7389 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 3016 ft., Bottom: 7389 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3016 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 3016 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3574 ft.NN
SUSSEX4040 ft.NN
SHANNON4614 ft.NN
NIOBRARA6888 ft.NN
FORT HAYS7152 ft.NN
CODELL7210 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/11/2024                Interval Top: 7214 ft.    Interval Bottom: 7224 ft.

 Completed Information for Formation CODELL
1st Production Date:11/21/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2012Treatment End Date:10/9/2012
Treatment Summary:(217240 lbs Ottawa) (8480 lbs Super LC 20/40) Pressure response was slightly positive for entire treatment.
Total fluid used in treatment (bbls):2071Max pressure during treatment (psi):3576
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2071Disposition method For flowback:DISPOSAL
Total proppant used (lbs):225720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/19/2005
Treatment Summary:BJ SERVICES FRACED USING 2544 BBL OF 20# VISTAR GEL, 217,720# OF 20/40 FRAC SAND, AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 12
BTU_GAS 1361
CALC_BBLS_H2O 1
CALC_BBLS_OIL 12
CALC_GOR 1250
CALC_MCF_GAS 15
CASING_PRESS 650
GRAVITY_OIL 47
MCF_GAS 15
Perforation Data:
Interval Top:7214 ft.# Of Holes:54
Interval Bottom:7224 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/7/2025                  Interval Top: 6903 ft.    Interval Bottom: 7224 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/16/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 16
BTU_GAS 1277
CALC_BBLS_H2O 6
CALC_BBLS_OIL 16
CALC_GOR 6375
CALC_MCF_GAS 102
CASING_PRESS 1318
GRAVITY_OIL 50
MCF_GAS 102
TUBING_PRESS 866
Perforation Data:
Interval Top:6903 ft.# Of Holes:82
Interval Bottom:7224 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/11/2024                Interval Top: 6903 ft.    Interval Bottom: 7032 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2012Treatment End Date:10/9/2012
Treatment Summary:Niobrara ""B"" Bench @ 7024'-7032' Niobrara ""A"" Bench @ 6903' - 6905' (238240 lbs Ottawa 20/40) (12300 20/40 Super LC) Pressure response was slightly positive for entire treatment. "
Total fluid used in treatment (bbls):2247Max pressure during treatment (psi):4928
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2247Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250540Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6903 ft.# Of Holes:28
Interval Bottom:7032 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/07/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
09/13/2028
Inactive ExceptionN 
Noticed InactiveYNoticed Date
07/26/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No