Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23143
Well Classification: OW Status: PA - 4/7/2025
Well Name/No:SCHMERGE #44-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/7/2025
FacilityID:279124LocationID:305554
County:WELD #123Location:SESE 4 5N67W 6
Field:WATTENBERG - #90750Elevation:4920 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:682FSL  658 FELLat/Long: 40.423113 / -104.890326Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.423140 / -104.890420Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2012
End Date: 10/9/2012
Reported: 12/7/2012
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/7/2025             Measured TD: 7418 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/7/2025
Wellbore PermitDRIFTED
Permit #:Expiration Date:8/1/2006
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SE4

Wellbore Completed
Completion Date:8/19/2005
Spud Date:8/14/2005Spud Date Is:ACTUAL
Measured TD:7418 ft.Measured PB depth:7375 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON, DUAL INDUCTION, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7389 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 3016 ft., Bottom: 7389 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3016 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 3016 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3574 ft.NN
SUSSEX4040 ft.NN
SHANNON4614 ft.NN
NIOBRARA6888 ft.NN
FORT HAYS7152 ft.NN
CODELL7210 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/11/2024                Interval Top: 7214 ft.    Interval Bottom: 7224 ft.

 Completed Information for Formation CODELL
1st Production Date:11/21/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2012Treatment End Date:10/9/2012
Treatment Summary:(217240 lbs Ottawa) (8480 lbs Super LC 20/40) Pressure response was slightly positive for entire treatment.
Total fluid used in treatment (bbls):2071Max pressure during treatment (psi):3576
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2071Disposition method For flowback:DISPOSAL
Total proppant used (lbs):225720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/19/2005
Treatment Summary:BJ SERVICES FRACED USING 2544 BBL OF 20# VISTAR GEL, 217,720# OF 20/40 FRAC SAND, AND 8000# OF SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 12
BTU_GAS 1361
CALC_BBLS_H2O 1
CALC_BBLS_OIL 12
CALC_GOR 1250
CALC_MCF_GAS 15
CASING_PRESS 650
GRAVITY_OIL 47
MCF_GAS 15
Perforation Data:
Interval Top:7214 ft.# Of Holes:54
Interval Bottom:7224 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/7/2025                  Interval Top: 6903 ft.    Interval Bottom: 7224 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/16/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 16
BTU_GAS 1277
CALC_BBLS_H2O 6
CALC_BBLS_OIL 16
CALC_GOR 6375
CALC_MCF_GAS 102
CASING_PRESS 1318
GRAVITY_OIL 50
MCF_GAS 102
TUBING_PRESS 866
Perforation Data:
Interval Top:6903 ft.# Of Holes:82
Interval Bottom:7224 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/11/2024                Interval Top: 6903 ft.    Interval Bottom: 7032 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2012Treatment End Date:10/9/2012
Treatment Summary:Niobrara ""B"" Bench @ 7024'-7032' Niobrara ""A"" Bench @ 6903' - 6905' (238240 lbs Ottawa 20/40) (12300 20/40 Super LC) Pressure response was slightly positive for entire treatment. "
Total fluid used in treatment (bbls):2247Max pressure during treatment (psi):4928
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.63
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2247Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250540Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6903 ft.# Of Holes:28
Interval Bottom:7032 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/07/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
09/13/2028
Inactive ExceptionN 
Noticed InactiveYNoticed Date
07/26/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No