|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 7955 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 2005182 | Expiration Date: | 11/20/2007 | | Proposed Depth/Form: | 7917 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 3800 ft., Bottom: 5000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/10/2007 | | Spud Date: | 2/3/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7955 ft. | Measured PB depth: | 7890 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMP NEU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 682 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 682 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7941 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 296, Top: 6250 ft., Bottom: 7941 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4988 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 3630 ft., Bottom: 4988 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4250 ft. | | N | N | | SHANNON | 4682 ft. | | N | N | | NOT COMPLETED | 7054 ft. | | N | N | | NIOBRARA | 7084 ft. | | N | N | | CODELL | 7350 ft. | | N | N | | J SAND | 7778 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7770 ft. Interval Bottom: 7818 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 161,162 GAL FRAC FLUID AND 251,080# SAND. 02/18/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 52 | | Interval Bottom: | 7818 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/16/2007 Interval Top: 7136 ft. Interval Bottom: 7818 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/14/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/10/2007 | | Treatment Summary: | JNBCD COMMINGLE DRILLED OUT CFP @ 7250' AND 7440' TO COMMINGLE THE JSND-NBRR-CODL . 03/13/07. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7756 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/16/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 134 | | BBLS_OIL | 66 | | BTU_GAS | 1235 | | CALC_BBLS_H2O | 134 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 10061 | | CALC_MCF_GAS | 664 | | CASING_PRESS | 728 | | MCF_GAS | 664 |
| | Perforation Data: | | Interval Top: | 7136 ft. | # Of Holes: | 172 | | Interval Bottom: | 7818 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7136 ft. Interval Bottom: 7370 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2007 | | Treatment Summary: | SEE SCANNED DOC# 1832273 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7136 ft. | # Of Holes: | 120 | | Interval Bottom: | 7370 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6216 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 2.944 |
| Average MCFE per Day | 17.070 |
| Federal Financial Assurance | i | |
|
|