|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/29/2017 Measured TD: 8600 ft. Vertical TD: 8420 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/29/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | 20062616 | Expiration Date: | 6/26/2007 | Prop Depth/Form: | 8651 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 11/11/2006 | Spud Date: | 10/31/2006 | Spud Date Is: | ACTUAL | Measured TD: | 8600 ft. | Measured PB depth: | 8532 ft. | True Vertical TD: | 8420 ft. | True Vertical PB depth: | 8352 ft. | Top PZ Location: | Sec:19 Twp: 1N 68W | Footage: 559 FSL 1982 FWL | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 559 FSL 1982 FWL | Log Types: | CBL,DUAL/COMPENSATED DENSITY/COMP. NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 882 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 765, Top: 0 ft., Bottom: 882 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8550 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 6600 ft., Bottom: 8550 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 250 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 75, Top: 0 ft., Bottom: 250 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4719 ft. | | N | N | NIOBRARA | 7670 ft. | | N | N | CODELL | 8016 ft. | | N | N | J SAND | 8461 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/29/2017 Interval Top: 8462 ft. Interval Bottom: 8478 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/1/2007 | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 161,204 GAL FRAC FLUID AND 250,180# SAND. 2/01/07 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8462 ft. | # Of Holes: | 32 | Interval Bottom: | 8478 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/23/2007 Interval Top: 7670 ft. Interval Bottom: 8478 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/20/2007 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/11/2006 | Treatment Summary: | JNBCD COMMINGLE SET CFP@7850'. DRILLED UP CFP@7850' AND 8140' TO COMMINGLE THE JNBCD. 02/14/07. CFP @ 7880' DRILLED UP ON 2/14/07 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8437 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/23/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 70 | BBLS_OIL | 61 | CALC_BBLS_H2O | 70 | CALC_BBLS_OIL | 61 | CALC_GOR | 6410 | CALC_MCF_GAS | 391 | CASING_PRESS | 1832 | MCF_GAS | 391 | TUBING_PRESS | 946 |
| Perforation Data: | Interval Top: | 7670 ft. | # Of Holes: | 164 | Interval Bottom: | 8478 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/29/2017 Interval Top: 7670 ft. Interval Bottom: 8034 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/1/2007 | Treatment Summary: | NB-CD RECOMPLETION SET CFP@8140'. 2/01/07. FRAC'D THE CODL W/112,580 GAL FRAC FLUID AND 250,240# SAND. 2/01/07 SET CFP@7880'. 2/01/07.FRAC'D THE NBRR W/166,210 GAL FRAC FLUID AND 250,320# SAND. 2/01/07 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7670 ft. | # Of Holes: | 132 | Interval Bottom: | 8034 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|