|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/4/2022 Measured TD: 8576 ft. Vertical TD: 8410 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/4/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20051554 | Expiration Date: | 5/26/2006 | Proposed Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 659 FSL 599 FWL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 659 FSL 599 FWL | Proposed Depth/Form: | 8596 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5460 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 4300 ft., Bottom: 5460 ft. |
| | |
Wellbore Completed | Completion Date: | 10/17/2005 | Spud Date: | 6/26/2005 | Spud Date Is: | ACTUAL | Measured TD: | 8576 ft. | Measured PB depth: | 8480 ft. | True Vertical TD: | 8410 ft. | True Vertical PB depth: | 8314 ft. | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 659 FSL 599 FWL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 659 S 599 W | Log Types: | CBL, DUAL INDUCTION, COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 750 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 7120 ft., Bottom: 8561 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5472 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 305, Top: 4240 ft., Bottom: 5472 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4469 ft. | | N | N | SHANNON | 5082 ft. | | N | N | NIOBRARA | 7508 ft. | | N | N | FORT HAYS | 7837 ft. | | N | N | CODELL | 7859 ft. | | N | N | MOWRY | 8265 ft. | | N | N | J SAND | 8278 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/4/2022 Interval Top: 8286 ft. Interval Bottom: 8315 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/17/2005 | Treatment Summary: | J SAND COMPLETION/ FRAC'D THE J SAND (8286'-8292' AND 8296'-8315') WITH 288,320# 20/40 SAND AND 12,000# SUPER LC 07/12/05. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8286 ft. | # Of Holes: | 50 | Interval Bottom: | 8315 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/18/2013 Interval Top: 7860 ft. Interval Bottom: 7877 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/25/2013 | Treatment End Date: | 6/25/2013 | Treatment Summary: | Set CIBP @ 7920'. Frac Codell with 250,100 # 20/40 sand and 82,291 gals (1959 bbls) frac fluid. | Total fluid used in treatment (bbls): | 1959 | Max pressure during treatment (psi): | 3815 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 438 | Fresh water used in treatment (bbls): | 1959 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250100 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7860 ft. | # Of Holes: | 68 | Interval Bottom: | 7877 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 8/7/2013 Interval Top: 7618 ft. Interval Bottom: 8315 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/22/2013 | Treatment End Date: | N/A | Treatment Summary: | Drill out plugs and land tubing @ 8266'. Well turned on 7-11-2013 to commingle the J Sand, Codell and Niobrara. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 10/17/2005 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE/ SET CBP @ 7200'. 10/13/05. DRILLED UP KILL PLUG @ 7200'. 10/16/05. DRILLED UP CBP @ 7780' AND 8000' TO COMMINGLE THE JSND-NBRR-CDL. 10/16/05. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8266 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/22/2013 | Test Method: | FLOW | Hours Tested: | 4 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 8 | BTU_GAS | 1204 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 48 | CALC_GOR | 4396 | CALC_MCF_GAS | 246 | CASING_PRESS | 1156 | GRAVITY_OIL | 4904 | MCF_GAS | 41 | TUBING_PRESS | 606 |
| Perforation Data: | Interval Top: | 7618 ft. | # Of Holes: | 238 | Interval Bottom: | 8315 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/4/2022 Interval Top: 7618 ft. Interval Bottom: 7877 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/15/2005 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/17/2005 | Treatment Summary: | NIOBRARA-CODELL RECOMPLETION/ SET CBP @ 8000' 8/7/05. FRAC'D THE CODELL (7860'-7877') WITH 208,530 GAL FRAC FLUID AND 300,720# SAND 8/11/05. SET CBP @ 7780' 9/11/05. FRAC'D THE NIOBRARA (7618-7648) WITH 207,642 GAL FRAC FLUID AND 301,120# SAND 9/18/05. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7618 ft. | # Of Holes: | 188 | Interval Bottom: | 7877 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/18/2013 Interval Top: 7618 ft. Interval Bottom: 7648 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/25/2013 | Treatment End Date: | 6/25/2013 | Treatment Summary: | Set CFP @ 7770'. Frac Niobrara with 250,660 # sand and 91,253 gal (2173 bbls) frac fluid. | Total fluid used in treatment (bbls): | 2173 | Max pressure during treatment (psi): | 4656 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.83 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 438 | Fresh water used in treatment (bbls): | 2173 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250660 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7618 ft. | # Of Holes: | 120 | Interval Bottom: | 7648 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/04/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|