|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2025 Measured TD: 8510 ft. Vertical TD: 8386 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20072601 | Expiration Date: | 6/5/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1320 FSL 2590 FWL | | Bottom Hole Location: | Sec:34 Twp: 1N 67W | Footage: 1320 FSL 2590 FWL | | Proposed Depth/Form: | 8469 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5700 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4700 ft., Bottom: 5700 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/2007 | | Spud Date: | 6/15/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8510 ft. | Measured PB depth: | 8410 ft. | | True Vertical TD: | 8386 ft. | True Vertical PB depth: | 8286 ft. | | Top PZ Location: | Sec:24 Twp: 1N 67W | Footage: 1311 FSL 2605 FWL | | Bottom Hole Location: | Sec:24 Twp: 1N 67W | Footage: 1311 FSL 2605 FWL | | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1125 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 1125 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8488 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 6970 ft., Bottom: 8488 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5484 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 4770 ft., Bottom: 5516 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4910 ft. | | N | N | | NIOBRARA | 7464 ft. | | N | N | | CODELL | 7904 ft. | | N | N | | J SAND | 8334 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 5/1/2025 Interval Top: 8344 ft. Interval Bottom: 8372 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/1/2007 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND WITH 161,036 GAL FRAC FLUID AND 250,520# SAND. 07/01/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8344 ft. | # Of Holes: | 44 | | Interval Bottom: | 8372 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 12/1/2011 Interval Top: 7658 ft. Interval Bottom: 8372 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | PRODUCTION TUBING 2 3/8 @ 8321'. CIBP SET AT 7960' AND CFP SET @ 7710 ON 8/7/11; DRILLED OUT 8/13/2011. | | Formation Treatment | | Treatment Date: | 7/1/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7770' AND 8020' TO COMMINGLE THE JSND-NBR-CDL. 07/12/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8321 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/29/2011 | Test Method: | FLOWING | | Hours Tested: | 2 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 8 | | BTU_GAS | 1370 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 1333 | | CALC_MCF_GAS | 128 | | CASING_PRESS | 538 | | GRAVITY_OIL | 43 | | MCF_GAS | 64 | | TUBING_PRESS | 341 |
| | Perforation Data: | | Interval Top: | 7658 ft. | # Of Holes: | 44 | | Interval Bottom: | 8372 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 5/1/2025 Interval Top: 7658 ft. Interval Bottom: 7926 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/7/2011 | | Treatment Summary: | NIOBRARA REFRAC - FRAC’D 7658'-7676' AND 7476'-7490' W/251,020 # SAND IN 140,070 GAL FRAC FLUID (8/7/11).
CODELL REFRAC – FRAC'D 7906’-7926’ W/250,840# SAND IN 121,716 GAL FRAC FLUID (08/07/2011). | | Formation Treatment | | Treatment Date: | 7/1/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 8020'. 07/01/07. FRAC'D THE CODELL WITH 114,446 GAL FRAC FLUID AND 250,480# SAND. 07/01/2007. SET CFP @ 7770' 07/01/07. FRAC'D THE NBRR WITH 170,290 GEL FRAC FLUID AND 238,920# 20/40 SAND, 12,000 12/20 SB EXCEL 07/01/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7658 ft. | # Of Holes: | 144 | | Interval Bottom: | 7926 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 18 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.011 |
| Average MCFE per Day | 0.050 |
| Federal Financial Assurance | i | |
|
|