|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/13/2022 Measured TD: 7820 ft. Vertical TD: 7693 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/13/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20062800 | Expiration Date: | 6/27/2007 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2588 FNL 1189 FEL | Bottom Hole Location: | Sec:10 Twp: 3N 67W | Footage: 2597 FNL 1195 FEL | Proposed Depth/Form: | 7820 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 470 , Unit Acreage: 320, Drill Unit: E/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 630 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 485, Top: 0 ft., Bottom: 630 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7812 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 760, Top: 3435 ft., Bottom: 7812 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/25/2005 | Spud Date Is: | ACTUAL | Measured TD: | 7820 ft. | Measured PB depth: | 7777 ft. | True Vertical TD: | 7693 ft. | True Vertical PB depth: | 7650 ft. | Top PZ Location: | Sec:10 Twp: 3N 67W | Footage: 2696 FNL 1189 FEL | Bottom Hole Location: | Sec:10 Twp: 3N 67W | Footage: 2687 FNL 1195 FEL | Log Types: | CBL, AILC, ML, CNLD | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 485, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7812 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 760, Top: 3420 ft., Bottom: 7812 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1483 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 265, Top: 180 ft., Bottom: 1493 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4074 ft. | | N | N | SHANNON | 4625 ft. | | N | N | NIOBRARA | 6922 ft. | | N | N | FORT HAYS | 7197 ft. | | N | N | CODELL | 7218 ft. | | N | N | J SAND | 7661 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 12/13/2022 Interval Top: 7670 ft. Interval Bottom: 7706 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/16/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/22/2007 | Treatment Summary: | 162,037 GALS FLUID & 115,540 LBS 30/50 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7670 ft. | # Of Holes: | 78 | Interval Bottom: | 7706 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: AB - 12/13/2022 Interval Top: 7220 ft. Interval Bottom: 7240 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/22/2005 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2011 | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 189,042 gal Slickwater w/ 150,780# 30/50, 4,000# SuperLC | Formation Treatment | Treatment Date: | 7/15/2005 | Treatment Summary: | CODELL 84534 GAL FLUID 185500 LBS 20/40 SAND FRAC INFO REPRESENTS: CODELL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 15 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 15 | CALC_GOR | 13600 | CALC_MCF_GAS | 204 | CASING_PRESS | 405 | GRAVITY_OIL | 49 | MCF_GAS | 204 | TUBING_PRESS | 393 |
| Perforation Data: | Interval Top: | 7220 ft. | # Of Holes: | 60 | Interval Bottom: | 7240 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OG Status: CM - 6/30/2011 Interval Top: 7220 ft. Interval Bottom: 7706 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 7/16/2007 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2011 | Treatment Summary: | CD REFRAC | Formation Treatment | Treatment Date: | 7/15/2005 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/27/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 5 | BTU_GAS | 1267 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 5 | CALC_GOR | 10000 | CALC_MCF_GAS | 50 | CASING_PRESS | 976 | GRAVITY_OIL | 55 | MCF_GAS | 50 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7220 ft. | # Of Holes: | 138 | Interval Bottom: | 7706 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 12/13/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|