|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/3/2020 Measured TD: 7970 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/3/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20064477 | Expiration Date: | 10/16/2007 | | Proposed Depth/Form: | 7970 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 946 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 665, Top: 0 ft., Bottom: 946 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7961 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 3364 ft., Bottom: 7961 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/15/2005 | | Spud Date: | 5/10/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7970 ft. | Measured PB depth: | 7945 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, GR, CDCN, DIGL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 946 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 0 ft., Bottom: 946 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7961 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 3364 ft., Bottom: 7961 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 475 ft., Bottom: 1530 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4477 ft. | | N | N | | NIOBRARA | 7053 ft. | | N | N | | FORT HAYS | 7311 ft. | | N | N | | CODELL | 7334 ft. | | N | N | | J SAND | 7993 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/6/2020 Interval Top: 7794 ft. Interval Bottom: 7856 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/1/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2010 | | Treatment Summary: | 8/6/10 -release RBP over CODL
8/19/10 -commingle NB-CD production with JSND production | | Formation Treatment | | Treatment Date: | 6/17/2010 | | Treatment Summary: | SET RBP @7258 W/2 SACKS OF SAND FOR MECHANICAL INTEGRITY. | | Formation Treatment | | Treatment Date: | 4/18/2007 | | Treatment Summary: | PERF & FRAC JSND W/200,408 GLAS FLUID & 120,400# 30/50 SAND. 7794-7804 (2SPF) 7816-7856 (2 SPF). |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7794 ft. | # Of Holes: | 100 | | Interval Bottom: | 7856 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/21/2011 Interval Top: 7334 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/9/2005 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2010 | | Treatment Summary: | 8/6/10 -release RBP over CODL
8/19/10 -commingle production with NBRR | | Formation Treatment | | Treatment Date: | 6/17/2010 | | Treatment Summary: | SET RBP@7258 W/2 SACKS OF SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO REMOVE RBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS. | | Formation Treatment | | Treatment Date: | 5/23/2005 | | Treatment Summary: | 141650 GAL FLUID FRAC INFO REPRESENTS; CODL 105924 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_GOR | 237000 | | CALC_MCF_GAS | 237 | | CASING_PRESS | 656 | | GRAVITY_OIL | 54 | | MCF_GAS | 237 | | TUBING_PRESS | 353 |
| | Perforation Data: | | Interval Top: | 7334 ft. | # Of Holes: | 48 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/30/2007 Interval Top: 7334 ft. Interval Bottom: 7856 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 5/1/2007 | Choke Size: | 0.156 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/23/2005 | | Treatment Summary: | CODL PERFS 05/20/2005 7334-7350. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7764 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1332 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 15857 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 600 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7334 ft. | # Of Holes: | | | Interval Bottom: | 7856 ft. | Hole Size: | 148 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/19/2010 Interval Top: 7106 ft. Interval Bottom: 7856 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/19/2010 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/16/2010 | | Treatment Summary: | 8/6/10 -release RBP over CODL
8/19/10 -commingle NB-CD production with JSND production |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7310 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/19/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1452 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 6300 | | CALC_MCF_GAS | 63 | | CASING_PRESS | 2050 | | GRAVITY_OIL | 53 | | MCF_GAS | 63 | | TUBING_PRESS | 1300 |
| | Perforation Data: | | Interval Top: | 7106 ft. | # Of Holes: | 204 | | Interval Bottom: | 7856 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2020 Interval Top: 7106 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/19/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2010 | | Treatment Summary: | 8/6/10 -release RBP over CODL
8/19/10 -commingle NB-CD production with JSND production |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7106 ft. | # Of Holes: | 104 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/21/2011 Interval Top: 7106 ft. Interval Bottom: 7200 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2010 | | Treatment Summary: | 8/6/10 -release RBP over CODL
8/19/10 -commingle production with CODL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1247 | | CALC_MCF_GAS | 82 | | CASING_PRESS | 150 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7106 ft. | # Of Holes: | 56 | | Interval Bottom: | 7200 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/06/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|