|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/2/2018 Measured TD: 7950 ft. Vertical TD: 7230 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20050583 | Expiration Date: | 4/28/2006 | | Proposed Top PZ Location: | Sec:17 Twp: 5N 65W | Footage: 1337 FSL 1 FEL | | Bottom Hole Location: | Sec:17 Twp: 5N 65W | Footage: 1337 FSL 1 FEL | | Proposed Depth/Form: | 8030 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/25/2005 | | Spud Date: | 10/19/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7950 ft. | Measured PB depth: | 7900 ft. | | True Vertical TD: | 7230 ft. | True Vertical PB depth: | 7197 ft. | | Top PZ Location: | Sec:16 Twp: 5N 65W | Footage: 1434 FSL 1 FWL | | Bottom Hole Location: | Sec:16 Twp: 5N 65W | Footage: 1434 FSL 1 FWL | | Log Types: | CNL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 456 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 456 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7931 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 3050 ft., Bottom: 7931 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4274 ft. | 4410 ft. | N | N | | NIOBRARA | 7240 ft. | 7697 ft. | N | N | | CODELL | 7732 ft. | 7760 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/18/2011 Interval Top: 7740 ft. Interval Bottom: 7750 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/1/2005 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/2011 | | Treatment Summary: | Re-Perf 7,740'-7,750'. Frac CODL [7740'-7750'] w/ 128,016 gal fluid and 251,820# 20/40 sand (32,197 gal slick wtr, 95,819 gal xlink gel). ISIP=2770 psi (0.83 F.G.). ISDP=3655 psi (0.95 F.G. 885 psi increase), ATP=5301 psi, ATR=50.9 BPM, µ,ave=23 cp @ 64°F. MTP=5445 psi, MTR=51.3 BPM. | | Formation Treatment | | Treatment Date: | 10/25/2005 | | Treatment Summary: | 120,750 GAL GEL, 240,700# 20/40 SAND AND 10,000# 20/40 RCS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 81 | | BTU_GAS | 1198 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 81 | | CALC_GOR | 5808 | | CALC_MCF_GAS | 470 | | CASING_PRESS | 700 | | GRAVITY_OIL | 55 | | MCF_GAS | 470 |
| | Perforation Data: | | Interval Top: | 7740 ft. | # Of Holes: | 40 | | Interval Bottom: | 7750 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/2/2018 Interval Top: 7264 ft. Interval Bottom: 7750 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7723 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/18/2011 | Test Method: | Flowing | | Hours Tested: | 432 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 596 | | BBLS_OIL | 724 | | BTU_GAS | 1294 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 5112 | | CALC_MCF_GAS | 205 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 59 | | MCF_GAS | 3701 | | TUBING_PRESS | 1580 |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 84 | | Interval Bottom: | 7750 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 3/20/2014 Interval Top: 7264 ft. Interval Bottom: 7466 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/2011 | | Treatment Summary: | Perf. Frac NBRR A [7,264'-7,270'] & NBRR B [7,460'-7,466'] w/ 221,172 gal fluid (126,420 gal SLKW, 94,752 gal XLG) and 306,220# sand (251,000 20/40 & 55,220 40/70). ISIP=3435 psi (0.95 F.G.). ISDP 3795 (FG 1.01, 360 psi increase), 1 min 3762, 4 min 3505, ATP=5303 psi, ATR=57.2 BPM,MTP=5727 psi, MTR=60.8 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 48 | | Interval Bottom: | 7466 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|